ShanBo
AC125D diesel portable air compressor overall appearance
AC125D two-stage compression airend and Cummins engine configuration
AC125D 36 m³/min high-capacity high-pressure air supply display
AC125D application with deep water well drilling rigs and geothermal drilling
AC125D diesel portable air compressor overall appearance
AC125D two-stage compression airend and Cummins engine configuration
AC125D 36 m³/min high-capacity high-pressure air supply display
AC125D application with deep water well drilling rigs and geothermal drilling

AC125D

Air Compressor

AC125D Air Compressor
AC125D Air Compressor

Product Details:AC125D Air Compressor

AC125D Diesel Portable Air Compressor

The AC125D is a diesel air compressor designed for high-pressure, high-capacity air applications such as deep water well drilling and geothermal drilling. With 36 m³/min displacement and 30 bar rated working pressure, it uses a two-stage compression structure to provide stable power support for down-the-hole drilling and other construction operations requiring a continuous high-pressure air source.

The unit is powered by a Cummins QSZ13-C550-30 engine with a rated power of 410 kW (550 hp) and water cooling. The 600 L fuel tank helps extend continuous operation time, making it suitable for outdoor drilling and engineering construction environments.

Main Technical Parameters

ModelAC125D
Air displacement36 m³/min
Rated working pressure30 bar
Compression stagesTwo-stage compression
Engine modelCummins QSZ13-C550-30
Engine power410 kW (550 hp)
Cooling methodWater-cooled
Fuel tank capacity600 L
Maintenance oil change volume120 L
Overall dimensions4220 × 2000 × 2300 mm
Overall weight5820 kg
Air outletsG1-1/2 and G2-1/2 dual outlets
Noise level82 dB(A)
ApplicationsDeep water well drilling rigs, geothermal drilling

Product Features

AC125D detail image 1

36 m³/min High-Capacity Air Supply

The AC125D provides 36 m³/min air displacement, meeting the demand for continuous, high-flow compressed air in drilling operations. It is suitable for use with deep water well drilling rigs and geothermal drilling equipment.

AC125D detail image 2

30 bar High Working Pressure

With a rated working pressure of 30 bar, it provides a stable air source for deep-hole drilling, down-the-hole impact, and other operations requiring higher air pressure. During actual matching, the required air volume and pressure should be confirmed according to the drilling rig, impactor, hole diameter, and construction depth.

Two-Stage Compression Structure

The unit uses two-stage compression, making it suitable for high-pressure output conditions and helping maintain stable air supply capability during continuous drilling operations.

Cummins High-Power Diesel Engine

Powered by a Cummins QSZ13-C550-30 engine rated at 410 kW (550 hp) and paired with a water cooling system, it meets the power requirements of outdoor drilling and long-duration continuous construction.

Application Scenarios

The AC125D is mainly used for deep water well drilling rigs, geothermal drilling, and similar projects. It can also serve as a supporting air source for drilling equipment requiring high-pressure, high-capacity compressed air. In actual use, the appropriate air compressor should be selected based on drilling depth, hole diameter, rock formation conditions, impactor specifications, and drilling rig configuration.

Matching and Selection Notes

When selecting an air compressor, it is recommended to confirm the drilling rig model, drilling diameter, target depth, main formations, down-the-hole impactor specifications, and required working pressure and air displacement. For deep holes, large diameters, or hard rock construction, sufficient air volume and pressure margin should be reserved to ensure cuttings removal and impact efficiency.

Precautions

Different geological conditions, drilling tool specifications, hole diameters, drilling depths, and operating methods can affect actual air demand and construction efficiency. The final selection should be based on on-site working conditions and the technical matching results of the drilling rig and impactor.

Online Inquiry