Trailer-Mounted Water Well Drilling Rig
WRTR1000

- Drilling Depth (m)
- 1000
- Rotary Table Opening (mm)
- 660
- Maximum Mast Load (T)
- 60

Trailer-Mounted Water Well Drilling Rig

Truck-Mounted Water Well Drilling Rig

Crawler-Mounted Water Well Drilling Rig

Trailer-Mounted Water Well Drilling Rig

Truck-Mounted Water Well Drilling Rig

Truck-Mounted Water Well Drilling Rig

Crawler-Mounted Water Well Drilling Rig

Crawler-Mounted Water Well Drilling Rig

Crawler-Mounted Water Well Drilling Rig

Crawler-Mounted Water Well Drilling Rig

Crawler-Mounted Water Well Drilling Rig

Crawler-Mounted Water Well Drilling Rig

Crawler-Mounted Water Well Drilling Rig

Crawler-Mounted Water Well Drilling Rig

Crawler-Mounted Water Well Drilling Rig

Crawler-Mounted Water Well Drilling Rig

Crawler-Mounted Water Well Drilling Rig

Crawler-Mounted Water Well Drilling Rig

Crawler-Mounted Water Well Drilling Rig

Crawler-Mounted Water Well Drilling Rig

Crawler-Mounted Water Well Drilling Rig

Crawler-Mounted Water Well Drilling Rig


We are a professional drilling equipment manufacturer specializing in the research and development, production and supply of water well drilling rigs, core drilling rigs, reverse circulation drilling rigs, down-the-hole drilling rigs, truck-mounted drilling rigs and mineral exploration equipment.
© 2026 Shandong Hengjianhang Construction Machinery Co., Ltd. All rights reserved.