ShanBo
Location:Home>Drilling Rigs>Water Well Drilling Rig>Crawler-Mounted Water Well Drilling Rig

-Crawler-Mounted Water Well Drilling Rig-

-Water Well Drilling Rig-

Crawler-Mounted Water Well Drilling Rig

WR1000S

WR1000S
Drilling Depth (m)
1000
Drilling Diameter (mm)
105-800
Lifting Capacity (T)
52

Crawler-Mounted Water Well Drilling Rig

WR1500S

WR1500S
Drilling Depth (m)
1500
Drilling Diameter (mm)
105-1000
Lifting Capacity (T)
80

Crawler-Mounted Water Well Drilling Rig

WR180E

WR180E
Drilling Depth (m)
180
Drilling Diameter (mm)
90-230
Lifting Capacity (T)
16

Crawler-Mounted Water Well Drilling Rig

WR1200SL

WR1200SL
Drilling Depth (m)
1200
Drilling Diameter (mm)
105-900
Lifting Capacity (T)
60

Crawler-Mounted Water Well Drilling Rig

WR200SE

WR200SE
Drilling Depth (m)
200
Drilling Diameter (mm)
140-254
Lifting Capacity (T)
13

Crawler-Mounted Water Well Drilling Rig

WR220SE

WR220SE
Drilling Depth (m)
220
Drilling Diameter (mm)
140-254
Lifting Capacity (T)
13

Crawler-Mounted Water Well Drilling Rig

WR300SE

WR300SE
Drilling Depth (m)
300
Drilling Diameter (mm)
105-325
Lifting Capacity (T)
15

Crawler-Mounted Water Well Drilling Rig

WR300SEL

WR300SEL
Drilling Depth (m)
300
Drilling Diameter (mm)
140-325
Lifting Capacity (T)
18

Crawler-Mounted Water Well Drilling Rig

WR350SE

WR350SE
Drilling Depth (m)
350
Drilling Diameter (mm)
105-350
Lifting Capacity (T)
16

Crawler-Mounted Water Well Drilling Rig

WR400QS

WR400QS
Drilling Depth (m)
400
Drilling Diameter (mm)
105-325
Lifting Capacity (T)
22

Crawler-Mounted Water Well Drilling Rig

WR400S

WR400S
Drilling Depth (m)
400
Drilling Diameter (mm)
105-325
Lifting Capacity (T)
22

Crawler-Mounted Water Well Drilling Rig

WR450SE

WR450SE
Drilling Depth (m)
450
Drilling Diameter (mm)
105-400
Lifting Capacity (T)
20

Crawler-Mounted Water Well Drilling Rig

WR500S

WR500S
Drilling Depth (m)
500
Drilling Diameter (mm)
105-400
Lifting Capacity (T)
30

Crawler-Mounted Water Well Drilling Rig

WR500SE

WR500SE
Drilling Depth (m)
500
Drilling Diameter (mm)
140-350
Lifting Capacity (T)
26

Crawler-Mounted Water Well Drilling Rig

WR600S

WR600S
Drilling Depth (m)
600
Drilling Diameter (mm)
105-400
Lifting Capacity (T)
35

Crawler-Mounted Water Well Drilling Rig

WR750S

WR750S
Drilling Depth (m)
750
Drilling Diameter (mm)
105-450
Lifting Capacity (T)
40

Crawler-Mounted Water Well Drilling Rig

WR260

WR260
Drilling Depth (m)
260
Drilling Diameter (mm)
140-305
Lifting Capacity (T)
15