ShanBo
Location:Home>About Us

-About Us-

Shandong Hengjianxing Engineering Machinery Co., Ltd. is a professional drilling equipment manufacturer, focusing on the research, development, production and supply of water well drilling rigs, core drilling rigs, reverse circulation drilling rigs, DTH drilling rigs, truck-mounted drilling rigs and mineral exploration equipment.

We have our own factory, production workshop, assembly area, and a professional team of experienced workers and technicians. From complete machine assembly and hydraulic system installation to equipment commissioning and final inspection, every drilling rig is carefully checked before delivery. Our goal is to provide customers with reliable drilling equipment, practical configuration solutions and competitive factory-direct solutions for different geological conditions and project requirements.

Our drilling equipment is widely used in water well construction, agricultural irrigation, industrial water supply, geological surveys, mineral exploration, gold exploration, copper exploration, lithium exploration and mining engineering, etc.

Water Well Drilling Rig Series

Our water well drilling rigs cover small, medium and heavy-duty equipment to meet the needs of different drilling depths and working conditions.

WR200SE / WR300SE / WR350SE / WR450SE Series

This series of economical crawler water well drilling rigs is designed for customers who balance drilling performance and equipment investment cost. The SE series adopts a telescopic mast design and cost-effective configuration, suitable for small and medium-sized water well projects, agricultural irrigation and rural water supply projects.

WR400S / WR500S / WR600S / WR750S Series

Our S series telescopic mast water well drilling rigs are suitable for medium-deep hole drilling operations. The telescopic mast helps improve equipment transportation convenience and on-site operation efficiency. This series is suitable for water well construction, agricultural projects, industrial water supply and groundwater development.

WR1000S / WR1200SL / WR1500S Series

This series consists of heavy-duty deep water well drilling rigs, developed for drilling projects with high requirements for drilling depth, lifting capacity and overall stability. The WR1200SL can be equipped with dual power configuration, allowing more flexible adaptation to different job site conditions.

Reverse Circulation Drilling Rig Series

For efficient drilling, sampling and mineral exploration projects, we offer a professional reverse circulation (RC) drilling rig series.

RC400 / RC500 / RC600 Series

This series of crawler reverse circulation drilling rigs combines good mobility, drilling efficiency and stable and reliable sample return capability, suitable for mineral exploration, geological surveys, water well projects, and other operations requiring reverse circulation drilling technology.

RC500E Series

The RC500E is an economical reverse circulation drilling rig, developed for customers who need RC drilling capability while controlling equipment investment cost, providing a cost-effective solution for drilling contractors and exploration projects with limited budgets.

Some RC models can also be optionally equipped with cyclone sampling systems and other auxiliary configurations according to drilling method and project requirements.

DTH and Pneumatic Drilling Rig Series

Our DTH drilling rigs are suitable for formations where compressed air drilling can achieve higher drilling efficiency.

WR400QS Series

The WR400QS is a pneumatic/DTH drilling rig, suitable for water well construction and hard rock formation drilling, meeting project requirements for efficient rock drilling and stable crawler travel performance.

Our DTH drilling rigs can be configured according to drilling depth, hole diameter, drill pipe specifications and air compressor requirements.

Truck-Mounted Drilling Rig Series

For customers who value transportation efficiency and need rapid relocation between different drilling sites, we offer a complete truck-mounted drilling rig series.

WRT600 Series

This is a practical truck-mounted water well drilling rig, integrating the drilling system and mobile truck chassis, suitable for drilling contractors who need to frequently travel between different drilling locations.

WRT1000 / WRT1000S / WRT1200 Series

This series of heavy-duty truck-mounted drilling rigs is developed for deep water well drilling and large-scale projects. Depending on the specific configuration, the drilling system, mud pump, air system and other auxiliary equipment can be integrated on a mobile platform.

Truck-mounted models are especially suitable for large water supply projects, deep groundwater development and professional drilling contractors.

Trailer-Mounted Drilling Rig Series

WRTR600 / WRTR1000 Series

Our trailer-mounted drilling rigs offer another flexible transportation option. Compared with crawler equipment, trailer-mounted models are more convenient for long-distance transfer between different drilling sites while still providing professional drilling capability.

The WRTR series can be configured for medium-deep water well construction according to customer needs.

Core Drilling Rig Series

In addition to water well drilling equipment, core drilling rigs are also one of our main product categories.

Our core drilling equipment is suitable for geological exploration, mineral exploration and core sampling projects, including exploration of gold, copper, lithium, iron ore and other mineral resources.

CR1000P Portable Core Drilling Rig

The CR1000P belongs to our portable core drilling rig series. Its modular and flexible design makes it easier to transport and install, especially suitable for mountainous areas, remote exploration sites, and locations where large machinery is difficult to access.

CR1200I Integrated Crawler Core Drilling Rig

The CR1200I is an integrated crawler core drilling rig, integrating the main drilling system and self-propelled crawler chassis, providing better mobility and on-site operation efficiency for geological and mineral exploration projects.

Heavy-Duty Split Core Drilling Rig

Our split core drilling rigs are designed for exploration projects with greater drilling depth and higher operational requirements, offering exploration rig configurations of approximately 1,000 m, 1,200 m, up to 2,200 m class.

The split structure allows major components to be transported separately, making it especially suitable for mountainous, forest, mining and other exploration sites with inconvenient access.

Underground Core Drilling Rig

For underground mine exploration, we also offer compact core drilling solutions suitable for limited working spaces. This type of equipment is suitable for underground geological surveys and mineral resource exploration.

Mineral Exploration Drilling Solutions

Our equipment is widely suitable for the following mineral exploration projects:

Gold Exploration

Core drilling rigs and RC reverse circulation drilling rigs for geological sampling, ore body investigation and exploration drilling.

Copper Exploration

Professional drilling solutions for surface and underground copper exploration projects.

Lithium Exploration

Core drilling equipment for lithium resource investigation and geological sampling.

Other Mineral Exploration

We can also provide corresponding solutions for iron ore, coal and other mineral resource exploration projects.

Customers can choose suitable equipment from portable core drilling rigs, crawler core drilling rigs, split core drilling rigs and reverse circulation drilling rigs according to geological formations and exploration methods.

Factory Production and Quality Control

We have our own production base, with dedicated operation areas for complete machine assembly, hydraulic installation, electrical installation, welding, testing and final inspection.

Experienced technicians and skilled workers focus on every production step to ensure each piece of equipment meets actual construction site requirements.

Pre-Delivery Inspection and Testing

  • Complete machine assembly inspection
  • Hydraulic system testing
  • Engine and power system testing
  • Mast lifting and operation testing
  • Drilling function testing
  • Crawler and travel system inspection
  • Final commissioning and inspection

Before and after equipment delivery, customers can also receive equipment testing videos, operation guidance and technical support.

Customized Drilling Solutions

Different drilling projects require different equipment configurations. We can recommend and customize drilling rigs for customers based on the following conditions:

Required Drilling Depth

From small shallow hole drilling equipment to heavy-duty deep hole drilling rigs, corresponding options are available.

Hole Diameter

Different power heads, drill pipes, casings and drilling tools can be selected according to the required hole diameter.

Geological Formation

Corresponding solutions can be provided for soil layers, clay layers, sand and gravel layers, weathered formations, hard rock and complex mixed formations.

Drilling Method

Including DTH drilling, mud rotary drilling, reverse circulation drilling and core drilling.

Working Environment

For different transportation conditions and construction sites, crawler, truck-mounted, trailer-mounted, portable, integrated and split configurations are available.

Why Choose Shandong Hengjianxing?

With a diverse range of drilling rig products and independent production capability, Shandong Hengjianxing Engineering Machinery Co., Ltd. provides customers not only with individual equipment, but also with complete drilling equipment solutions based on actual project requirements.

From 200 m class economical water well drilling rigs to 1,500 m class heavy-duty deep water well drilling equipment; from portable core drilling rigs to 2,200 m class deep mineral exploration drilling rigs, our products can meet the operational needs of drilling contractors, mining companies, geological exploration teams and water well projects around the world.

Water Well Drilling · Core Drilling · Reverse Circulation Drilling · Mineral Exploration · Deep Hole Drilling

Reliable Equipment · Factory Manufactured · Professional Drilling Solutions

Shandong Hengjianxing — Your Partner for Water Well Drilling and Mineral Exploration Equipment.