ShanBo

Crawler-Mounted Water Well Drilling Rig

Truck-Mounted Water Well Drilling Rig

Trailer-Mounted Water Well Drilling Rig

Reverse Circulation Drilling Rig

Split-Type Core Drilling Rig

Integrated Core Drilling Rig

Photovoltaic Pile Driver

Integrated Down-the-Hole Drilling Rig

Reverse Circulation Drilling Rig

RC400

RC400
Drilling Depth (m)
400
Drilling Diameter (mm)
105-305
Lifting Capacity (T)
22

Pile Foundation Drilling Rig

FR800

FR800
Drilling Depth (m)
800
Drilling Diameter (mm)
200-600
Lifting Capacity (T)
40

Photovoltaic Pile Driver

PV390

PV390
Drilling Depth (m)
6
Drilling Diameter (mm)
80-600
Maximum Torque (N·m)
13000

Trailer-Mounted Water Well Drilling Rig

WRTR1000

WRTR1000
Drilling Depth (m)
1000
Rotary Table Opening (mm)
660
Maximum Mast Load (T)
60

Truck-Mounted Water Well Drilling Rig

WRT1200

WRT1200
Drilling Depth (m)
1200
Drilling Diameter (mm)
105-900
Lifting Capacity (T)
61

Crawler-Mounted Water Well Drilling Rig

WR1000S

WR1000S
Drilling Depth (m)
1000
Drilling Diameter (mm)
105-800
Lifting Capacity (T)
52

Integrated Down-the-Hole Drilling Rig

DTH30C

DTH30C
Drilling Depth (m)
30
Drilling Diameter (mm)
76-280

Tunnel Drilling Rig

CR800UG

CR800UG
Drilling Depth (m)
800
Coring Capacity (m)
BQ 920 / NQ 800 / HQ 380
Pullback Force (kN)
130

Integrated Core Drilling Rig

CR1000I

CR1000I
Drilling Depth (m)
1000
Coring Capacity (m)
BQ 1200 / NQ 1000 / HQ 500
Pullback Force (kN)
185

Split-Type Core Drilling Rig

CR1000P

CR1000P
Drilling Depth (m)
1000
Coring Capacity (m)
BQ 1150 / NQ 1000 / HQ 550
Pullback Force (kN)
130

Watch on YouTube

NEWS

Latest News

Online Inquiry

Before You Buy

After-sales Support

Our machines come with a 12-month warranty. During this period, core components can be replaced at factory cost.

Logistics

The seller can help arrange freight and deliver the equipment to the address or port designated by the customer. Shipping costs are borne by the buyer and should be paid before shipment. For bulk orders, we can help coordinate with freight forwarders to ensure safe and timely delivery. The remaining balance must be paid in full before shipment.

Will all equipment be tested before shipment?

Yes. We perform functional testing before shipment and can provide test videos so customers can purchase with confidence.

What guarantees does the seller provide?

Due to the high cost of transporting complete machines, returns or exchanges are usually not supported after shipment.
If parts are damaged during use or transport, please send us clear photos. We will provide the required replacement parts at a low factory price and ship them directly from the factory.
As a direct manufacturer, we can also provide long-term parts and attachment support for future maintenance needs.
All parts and attachments are supplied at direct factory prices.