Pile Foundation Drilling Rig
FR800

- Drilling Depth (m)
- 800
- Drilling Diameter (mm)
- 200-600
- Lifting Capacity (T)
- 40

Pile Foundation Drilling Rig


We are a professional drilling equipment manufacturer specializing in the research and development, production and supply of water well drilling rigs, core drilling rigs, reverse circulation drilling rigs, down-the-hole drilling rigs, truck-mounted drilling rigs and mineral exploration equipment.
© 2026 Shandong Hengjianhang Construction Machinery Co., Ltd. All rights reserved.