ShanBo
ZCS100 Screw Air Compressor Overall Appearance
ZCS100 33 m³/min Large-Displacement Air Supply Display
ZCS100 2.5 MPa High-Pressure Output Configuration
ZCS100 315 kW Industrial Power and Maintenance Structure
ZCS100 Screw Air Compressor Overall Appearance
ZCS100 33 m³/min Large-Displacement Air Supply Display
ZCS100 2.5 MPa High-Pressure Output Configuration
ZCS100 315 kW Industrial Power and Maintenance Structure

ZCS100

Air Compressor

ZCS100 Air Compressor
ZCS100 Air Compressor

Product Details:ZCS100 Air Compressor

ZCS100 Screw Air Compressor

The ZCS100 is an industrial screw air compressor designed for continuous air-demand scenarios such as drilling, mining, quarries, and engineering construction. With an air displacement of 33 m³/min, a rated pressure of 2.5 MPa (25 bar), and a power of 315 kW, it can provide continuous compressed air for water well drilling, mining drilling, and other equipment requiring a stable high-pressure air source.

The equipment adopts an industrial-grade enclosure structure, balancing efficient air supply, stable output, and convenient daily maintenance. For drilling operations, the air volume and pressure of the air compressor directly affect the working condition of the DTH hammer, cuttings removal capacity, and drilling efficiency. Therefore, matching selection should be based on borehole diameter, hole depth, formation, and hammer specifications.

Main Technical Parameters

Product ModelZCS100
Product TypeScrew Air Compressor
Air Displacement33 m³/min
Rated Pressure2.5 MPa (25 bar)
Power315 kW
Overall Dimensions3960 × 2000 × 2000 mm
ManufacturerZhejiang Zhigao Machinery Co., Ltd.
Main ApplicationsWater well drilling, mining drilling, quarries, engineering construction

ZCS100 Detail Image 1

Product Features

Stable Large-Displacement Air Supply of 33 m³/min

The ZCS100 can provide an air displacement of 33 m³/min, making it suitable for drilling and engineering construction scenarios that require a continuous large air volume of compressed air. Stable air supply is beneficial for DTH impact, hole-bottom cuttings removal, and continuous drilling.

2.5 MPa High-Pressure Output

The rated pressure reaches 2.5 MPa, equivalent to 25 bar, making it suitable for drilling conditions with high working pressure requirements. For deep holes, hard rock, or larger borehole construction, comprehensive matching should be carried out based on the hammer's recommended pressure and air consumption.

ZCS100 Detail Image 2

315 kW Industrial Power

The 315 kW power configuration is designed for high-load continuous operation requirements, providing the power foundation for high-pressure, large-displacement air supply. It is suitable for construction environments such as mines, quarries, water wells, and foundation engineering.

ZCS100 Detail Image 3

Industrial-Grade Structure and Maintenance Design

The equipment adopts a closed industrial enclosure structure and is equipped with control, electrical, intake filtration, cooling, oil filtration, and oil separation systems, facilitating equipment operation management and daily maintenance.

Applicable Scenarios

The ZCS100 can be used in water well drilling, mining drilling, quarry blast hole construction, and engineering construction scenarios. As a matched air source for drilling rigs, it can provide compressed air for DTH hammers, pneumatic drilling tools, and other air-consuming equipment.

In agricultural irrigation wells, municipal water supply wells, mining exploration, quarries, and foundation construction projects, whether the air compressor meets actual needs should be confirmed based on the drilling rig model, target hole depth, borehole diameter, rock formation conditions, and hammer air consumption.

Selection Instructions

When selecting the ZCS100 screw air compressor, it is recommended to provide the drilling rig model, borehole diameter, target depth, main formations, hammer model, and required working pressure and air consumption. For deep holes, large boreholes, or hard rock construction, appropriate air volume and pressure margins should be reserved to ensure cuttings removal and impact efficiency.

ZCS100 Detail Image 4

Notes

Different geological conditions, borehole depths, borehole diameters, drilling tool specifications, and operating methods will affect actual air consumption and construction efficiency. The final selection shall be subject to on-site working conditions, matched drilling rig, and hammer technical requirements.

Online Inquiry