
Drill pipe
Φ102×6m water well drill pipe is a drilling tool used with drilling rigs for water well drilling operations, with an outer diameter of 102mm and a length of 6m. This specification is suitable for agricultural irrigation wells, industrial water supply wells, municipal water supply wells, and groundwater exploration, and can be used with different types of water well drilling rigs.
The drill pipe body is made of high-strength steel, available in DZ50, R780, G105 and other steel grades. The thread type can be customized according to different drilling rig specifications, construction requirements, and connection methods, so as to match existing drill pipes, drill bits, and other drilling tool systems.
| Product Model | Φ102w |
| Product Name | Φ102×6m Water Well Drill Pipe |
| Drill Pipe Outer Diameter | 102 mm |
| Drill Pipe Length | 6 m |
| Optional Steel Grade | DZ50 / R780 / G105 |
| Thread Type | Customizable according to drilling rig specifications |
| Joint Type | API standard joints or matched as required |
| Applicable Process | Rotary drilling / Percussive drilling |
| Main Uses | Water well drilling, water supply wells, irrigation wells, groundwater exploration |
102mm is one of the common drill pipe outer diameter specifications in water well drilling. For projects that require a balance of drilling capability, pipe body strength, and versatility, this specification can be used as a matching drill pipe for various water well drilling rigs.
The 6m single length helps reduce the number of pipe connections during drilling and improves continuous operation efficiency. In actual use, whether the 6m drill pipe matches the equipment should be confirmed based on the drilling rig mast stroke, clamping structure, and on-site working space.
DZ50, R780, G105 and other steel grades are available to meet different construction intensities, drilling rig configurations, and project requirements. The specific steel grade should be confirmed according to drilling rig torque, well depth, formation, and operating conditions.
Different brands and models of drilling rigs may use different thread connection forms, so this product supports confirming the thread type based on the customer's existing drilling rig, drill pipe, or matching drilling tools. Before ordering, it is recommended to provide the existing drill pipe joint specifications or clear thread dimension information.

Φ102×6m water well drill pipe can be used in agricultural irrigation wells, farm water supply, industrial water, municipal drinking water projects, and groundwater exploration, covering common shallow to medium-depth water well construction needs.
This drill pipe can be used with rotary or percussive drilling processes. In actual construction, the matching drilling tool combination should be selected according to formation conditions, target well depth, borehole diameter, drilling rig torque, and the drill bit or hammer used.
The drill pipe is made of high-strength steel, and common specifications can be arranged for shipment according to inventory. The product can be customized in length and thread, and anti-rust oil and thread protectors can be used for transport protection of the drill pipe and joints, reducing the risk of thread damage or corrosion during long-distance transportation and export.
When ordering Φ102×6m water well drill pipe, it is recommended to provide information such as drilling rig model, existing drill pipe outer diameter, single length, thread type, drilling purpose, and construction formation. If the thread specification cannot be confirmed, photos of the joints and key dimensions can be provided for further verification and matching.
Different geological conditions, drilling rig parameters, drilling tool combinations, drilling angles, and operating methods will affect the actual performance and service life of the drill pipe. The final result shall be subject to on-site working conditions and actual technical matching results.

We are a professional drilling equipment manufacturer specializing in the research and development, production and supply of water well drilling rigs, core drilling rigs, reverse circulation drilling rigs, down-the-hole drilling rigs, truck-mounted drilling rigs and mineral exploration equipment.
© 2026 Shandong Hengjianhang Construction Machinery Co., Ltd. All rights reserved.