When reviewing deep water well equipment data, mast type, drill pipe length and lifting force are often treated as three independent lines: the mast is marked telescopic or straight, the drill pipe is marked with diameter and length, and the lifting force is marked in tonnage. Each line is clear on its own, but when combined for a 600 m class well, problems easily arise—the number of pipe connections cannot be calculated clearly, tripping loads cannot be estimated accurately, and transport dimensions are not reserved. This article follows the order of data reading to explain why these three data sets must be read together.
Reading the three data sets separately misses the linkage between process stages
In deep hole construction, auxiliary time is dominated by pipe connection and tripping. The mast determines how long a drill pipe can be accommodated at one time, the drill pipe length determines connection frequency, and the lifting force determines the drill string and friction load that can be handled during tripping. If any one of the three is individually exaggerated or underestimated, the margins of the other two will be misjudged.
For a 600 m class hole depth, if 6 m drill pipes are used, the theoretical number of connections is on the order of one hundred; if 3 m drill pipes are used, the number of connections doubles. This difference cannot be reflected by the drill pipe line alone; it simultaneously affects mast travel and lifting operation frequency. When reading the data, first place these three items in the same process table, then look at individual values—the judgment will be more reliable.
The telescopic mast is not only about transport dimensions
The WR600S associated with this article is a 600 m class telescopic mast crawler-type fully hydraulic water well drilling rig. The data states that it supports 6 m drill pipes and that the telescopic structure can improve the overall transport dimensions. The overall weight is approximately 12.5 T, and the dimensions are approximately 6.73 × 2.1 × 2.63 m.

The telescopic mast appears in the data with two functions: accommodating 6 m drill pipes during operation and reducing dimensions during transport. When reading the data, it is necessary to distinguish that these two matters correspond to different process stages—the operating state looks at the clearance after the mast is extended and the space for drill pipe connection, while the transport state looks at the dimensions after retraction and vehicle matching. The two cannot substitute for each other: small transport dimensions do not mean the connection space after extension is necessarily sufficient; large extended clearance does not mean loading for relocation is convenient.
Correspondence between 6 m drill pipes and the mast
The data clearly states a drill pipe length of 6 m, with recommended diameters of 89 / 102 mm. The mast supporting this length means a single connection can advance 6 m. For a 600 m class hole depth, this combination reduces the number of connections rather than amplifying the hole depth capability. The actual depth that can be drilled still depends on formation, hole diameter, drilling tools and supporting equipment.
The lifting force margin must be understood within the drill string load
The WR600S has a lifting force of 35 T and a feed force of 6 T. In deep holes, the drill pipe's own weight, borehole wall friction, casing weight and local diameter reduction all increase the lifting load. The data describes 35 T as leaving a larger margin for deep hole drill strings and casing handling; this statement should be read in terms of load composition, not as a guarantee that any downhole situation can be forcibly handled.

The data also reminds: if lifting resistance suddenly becomes abnormal, the hole should first be cleaned and the borehole wall condition judged, avoiding direct reliance on maximum lifting force for forced handling. This limitation is integral to the lifting force value; when reading the data, one should not remember only the tonnage and skip the precondition.
| Data item | Verified value | Corresponding process |
|---|---|---|
| Maximum drilling depth | 600 m | Reference for project depth range, not actual completion depth in any formation |
| Drilling diameter | 105–400 mm | Hole diameter related to drilling tools, cuttings removal and casing design |
| Drill pipe | 6 m, 89 / 102 mm | Connection frequency and drill string weight |
| Lifting force | 35 T | Tripping, DTH hammer retrieval and some casing operations |
| Rotary torque | 12000 / 6000 N·m | Corresponding to maximum speeds 90 / 180 r/min, select condition by load |
| Overall weight | Approx. 12.5 T | Transport vehicle and site bearing capacity |
Torque and rotation speed are the fourth data set to read together
The data gives dual-condition torque of 12000 / 6000 N·m, corresponding to maximum speeds of 90 / 180 r/min. Larger hole diameters, hard rock and high-friction hole sections are more suitable for low speed and high torque; when resistance is small or drilling tool load is light, higher speed can be selected. The relationship between this data set and lifting force lies in: increased downhole resistance is often reflected simultaneously in rotary load and lifting load; the two lines of values should be judged against field performance, not each taken to its upper limit.
The reference drilling efficiency in the data is 10–35 m/h, and it states that the actual penetration rate depends on formation hardness, hole diameter, DTH hammer, air compressor displacement and operating method. This range cannot be directly converted into a construction schedule, nor used to promise completion time for a specific well.

Putting the three data sets into a pre-drilling checklist
Assume a 600 m class water supply well, with soil and gravel overburden in the upper part and relatively intact hard rock in the lower part (this is a scenario illustration, not a project record from this site). According to the data, this combination requires both mud rotary and DTH drilling methods, and supporting conditions change accordingly:
- Mast and drill pipe: confirm the connection space for 6 m drill pipes, and whether the retracted telescopic mast dimensions match a flatbed truck during transport.
- Lifting force: estimate the lifting load based on drill string weight plus expected friction, and verify whether casing weight is within the 35 T margin.
- Air supply: DTH drilling recommends working pressure 1.2–3.5 MPa and air consumption 16–55 m³/min; when hole depth increases, hole diameter becomes larger, rock becomes harder or altitude rises, the actual required displacement may increase, and the air compressor must be matched separately for the project.
- Site: crawler travel speed is approximately 3 km/h, maximum climbing angle reference 21°, overall weight 12.5 T; before relocation, confirm ground bearing capacity, slope and wet/slippery conditions; hydraulic outrigger stroke is 1.6 m, and pads should be used on soft ground.
Parts not covered by the data and still requiring confirmation before purchase
The following points have no clear conclusions in this article's data and should not be inferred:
- Under specific formation combinations, the actual completion depth and hole diameter combination corresponding to the nominal 600 m drilling depth need to be judged in conjunction with hydrogeological data and aquifer location.
- For the specific adaptation conditions of 6 m drill pipes with the two diameters 89 / 102 mm, the data only gives recommended values; thread form, material and DTH hammer specifications need to be verified with the supplier.
- The actual usable margin of the 35 T lifting force under different friction conditions; the data does not provide a breakdown load table.
- The specific operating space requirements for extending and retracting the telescopic mast; the data only gives overall dimensions, and site layout needs separate confirmation.
- Mud pump, centrifugal pump, generator and foam pump are optional configurations; specific models and matching to project formation need separate confirmation.
When requesting a quotation, it is recommended to provide the drilling purpose, formation data, target hole depth and diameter, planned drilling method, access road and transport conditions, water, electricity and air supply conditions, and whether casing and completion structure are required. This information is more helpful than looking at a single tonnage or meter figure in judging whether the equipment class matches.