Stability and Air Supply Checks Before a Compact DTH Rig Is Positioned on a Slope Anchoring Platform

Date:2026-11-18 09:19:32Views:40

In slope anchoring work, the real difficulty with a drill rig is often not the drilling itself, but whether it can stand safely and stably at the designed hole position. Anchor bolt holes, anchor cable holes and drainage holes are mostly laid out on platforms after slope cutting, where the working face is narrow, the free face is close, and the ground is often backfill or cut-and-fill. If equipment is selected only by hole diameter and drilling depth before entering the site, the positioning stage can lead to repeated adjustments or even rework. This article breaks down the scenario: on a slope platform with limited space, what site stability and air supply items must be checked before a compact crawler DTH drill rig is positioned.

First, clarify the work objective

Slope anchoring holes are typically characterized by shallow depth, multiple hole directions, and hole positions arranged in rows along the slope face. Taking the 30 m-class crawler hydraulic DTH drill rig associated with this article as an example, the data gives a maximum drilling depth of 30 m, a drilling diameter of 76–280 mm, a maximum rotary torque of 3500 N·m, and suitability for rock hardness of about f = 8–24. It can be used for anchor bolt holes, anchor cable holes and drainage holes in highway, railway, foundation pit and retaining wall construction. These figures show that it is intended for short and medium-shallow holes in engineering hard rock, not deep water well equipment.

Accordingly, the questions to answer before positioning can be grouped into three categories: whether the platform can bear the equipment and the drilling reaction force; whether the machine attitude can cover the designed hole directions; and whether the compressed air and cuttings removal setup can keep up with the working rhythm of the DTH hammer.

Platform and ground: first confirm it can "stand firm"

The data describes the applicable ground for the equipment as compacted soil, gravel roads, construction access roads and generally uneven sites. The chassis is engineering rubber crawler tracks, the overall weight is about 2500 kg, and the dimensions are about 3200 × 1200 × 1850 mm. A width of about 1.2 m is an advantage on narrow platforms, but the weight, along with the vibration and feed reaction force during drilling, still has to be borne by the platform.

Stability and Air Supply Checks Before a Compact DTH Rig Is Positioned on a Slope Anchoring Platform

  • Platform width and edge distance: beyond the machine width, safe distance outside the tracks and operator standing space must also be reserved; it is inadvisable to place the machine right against the free-face side.
  • Ground bearing capacity: whether backfill soil and loose deposits have been compacted, and whether bearing plates or temporary hardening are needed. The original data does not give ground contact pressure, so this item must be confirmed on site.
  • Falling rocks on the slope and support above: the data explicitly notes that before slope construction, platform stability, falling rock risk and support conditions should be checked, and work should not be carried out directly on unstable slopes.
  • Underground pipelines and nearby structures: when working in a plant area or beside a road, it should be confirmed before entry whether there are pipelines beneath the hole positions.

It should be noted that rubber crawler tracks are friendlier to paved roads and concrete surfaces, and their grip is relatively favorable on gravel, compacted soil and generally rough terrain, but this does not mean they can replace platform reinforcement. Whether the platform meets bearing requirements still depends on the actual geology and support design.

Machine attitude: view swing angle range and tilt adjustment separately

The hole directions of anchoring holes are determined by design, and whether the equipment can cover these angles directly affects whether repeated machine repositioning is needed. The data gives a swing angle range of 18–180° and states that tilt adjustment is available, but does not give the specific numerical range of the tilt angle.

Check itemInformation given in the dataStill to be confirmed
Swing angle18–180°Whether it can cover all designed hole directions of the project
Tilt adjustmentFunction available, no numerical value givenActual adjustable angle subject to formal technical documents
Slide frame stroke3.2 m, effective stroke 2.2 mWhether it matches the planned drill rod length and rod connection method

A wide swing angle range means there is more room to adjust attitude at the same stopping position, which may reduce the number of machine repositioning moves; but swing angle coverage does not mean the platform has enough space to complete the movement. The mast occupies three-dimensional space during adjustment and drilling, so the clearance above the platform and the rear slewing radius must be measured in advance. The specific range of tilt adjustment is not listed in the data; if the project has high requirements for hole direction accuracy, formal technical confirmation documents should be obtained from the supplier before purchase or entry.

Air supply: the first constraint on DTH hammer efficiency

DTH drilling relies on compressed air to drive the DTH hammer and discharge cuttings. When air supply capacity is insufficient, both impact energy and cuttings removal are affected. The reference air consumption in the data is about 8 m³/min, with a note that the original table marked it as 8 m²/min; it is interpreted according to the common unit for compressed air flow, and the formal technical data shall prevail.

Stability and Air Supply Checks Before a Compact DTH Rig Is Positioned on a Slope Anchoring Platform

Air supply items to be checked before positioning include:

  • Whether the air compressor displacement and pressure match the specifications of the planned DTH hammer;
  • The length, joint type and routing of the high-pressure air hose, and whether the hose route obstructs personnel passage and equipment movement when the platform is narrow;
  • The parking position of the air compressor itself, whether it is outside the falling rock impact area, and whether it affects platform bearing;
  • Whether supporting items required for DTH hammer lubrication, such as an oil mist lubricator, are complete.

The data does not give specific requirements for the air compressor pressure rating, nor the correspondence between air volume and different hole diameters. Therefore, the air compressor model cannot be determined solely from the reference value of 8 m³/min; it should be confirmed in combination with the DTH hammer manufacturer's data and the hole diameter.

Cuttings removal and dust: additional conditions on the platform

DTH drilling produces high-speed exhaust and a large amount of rock dust, and dust is more pronounced in dry hard rock. The data notes that a dust collector or water mist dust suppression system can be configured according to the project, and recommends configuring goggles, dust masks and hearing protection according to local construction regulations.

On slope platforms, space is limited and airflow conditions differ from open sites, so dust tends to linger on the working face. During the positioning stage, the placement of dust suppression devices and the water source can be considered at the same time, but the data does not give the specific model and air volume parameters of the dust collector; this part needs to be confirmed separately according to the project configuration. In addition, during drilling, personnel must not enter the areas of the rotating drill rod, high-pressure exhaust and mast movement; this is especially important for standing position arrangements when the platform is narrow.

Stability and Air Supply Checks Before a Compact DTH Rig Is Positioned on a Slope Anchoring Platform

How far crawler mobility can be used between platforms

The data gives a travel speed of 5–10 km/h and an overall weight of about 2500 kg. Compared with large DTH equipment, it is easier to transport and load/unload, and is suitable for short-distance transfers within the site. For anchoring projects with multiple rows of hole positions arranged along the slope face, the equipment may move frequently between platforms, and a crawler chassis offers some convenience for such short-distance movement.

However, note that travel speed is the machine's own driving capability and does not represent actual passability on slopes and access roads. The longitudinal slope, turning radius, road surface compaction, and the load capacity and securing method of transport vehicles on the entry route should all be checked separately before entry. The data mentions that loading ramps must have sufficient bearing capacity and prevent track side slip; this belongs to the transport organization stage and should not be confused with platform positioning conditions.

Items recommended to be checked in order before positioning

  1. Whether the list of designed hole directions is complete, whether the 18–180° swing angle can cover all hole positions, and whether the tilt range has been confirmed with the supplier.
  2. Whether platform bearing capacity and edge distance meet the requirements for equipment parking and drilling reaction force, and whether bearing plates or reinforcement are needed.
  3. Whether the falling rock risk above and the support status have been investigated, and whether the equipment parking position is outside the impact area.
  4. Whether the planned DTH hammer specifications match the air compressor displacement and pressure, and whether the air hose route is unobstructed.
  5. Whether dust suppression or dust collection configuration and operator protective equipment are in place.
  6. Whether the load capacity of transport vehicles, loading ramps and site access road conditions have been confirmed.

Conditions to provide together when requesting a quotation

If preparing to request a quotation for a compact DTH drill rig for slope anchoring, it is recommended to provide the supplier with: drilling purpose and hole type (anchor bolt hole, anchor cable hole or drainage hole), designed hole depth and diameter, rock type and hardness estimate, designed hole direction range, platform dimensions and ground conditions, site access road and transport restrictions, air compressor parameters available on site, and whether dust collection or water mist dust suppression configuration is required. The specific tilt values, ground contact pressure and air volume matching for different hole diameters not covered in the data should be confirmed item by item during the technical confirmation stage; construction should not be organized solely on the basis of reference values in product data.