Foundation construction in a solar farm is not a single working condition. For conventional array-mounted support piles, the number of pile positions is large and the spacing is regular, so the equipment must complete many cycles of “stop—align—drill—move” in a day. In another case, a single or a small number of foundation holes require a larger diameter; although the drilling depth is shorter, the challenges to rotary torque, hole diameter coverage, and cuttings removal are more concentrated. Discussing “whether it is sufficient” by mixing these two types of operations can easily lead to a misdirected focus during procurement.
This article focuses on the verified data for the PV390 four-cylinder hydraulic crawler-type solar pile driver, comparing the issues that continuous pile position operations and single-point large-diameter operations each require the equipment to address. It explains which characteristics correspond to which needs, and which conditions must be separately confirmed by the project and site.
First, distinguish the differences between the two types of operations
The construction rhythm of continuous pile position operations is usually determined by machine movement and hole alignment. Solar farm pile positions are densely arranged, and the drilling depth for each hole may not be large, but if the machine body must be repeatedly adjusted at every pile position, the cumulative auxiliary time will be significant. This type of operation is more concerned with whether the equipment can complete lateral and longitudinal position corrections after stopping, and whether the chassis can move easily over short distances on unpaved ground.
Single-point large-diameter operations place pressure inside the hole. As the hole diameter increases, the contact area between the drilling tool and the hole wall and the volume of cuttings increase, so the rotary system must maintain sufficient torque, and the feed must match the strata conditions. If the strata contain gravel, backfill, or strongly weathered rock, the risks of jamming and hole deviation become more prominent after the hole diameter is enlarged.
| Operation focus | Main constraints | Data items to check first during selection |
|---|---|---|
| Continuous pre-drilling at dense pile positions | Machine repositioning frequency, hole alignment speed, site trafficability | Chassis type, mast swing and telescopic compensation, track shoe width |
| Single-point large-diameter hole drilling | Rotary torque, hole diameter coverage, cuttings removal and drilling tool matching | Reducer torque, drilling diameter range, feed method |
This table does not set the two types of operations in opposition; rather, it reminds buyers to first determine which type dominates their project. Both needs can be met by the same machine, but the priorities differ, and the focus when checking data should also differ.

How the PV390 data responds to continuous pile position requirements
The PV390 uses a crawler chassis with a track shoe width of 400 mm, and the overall dimensions are 5200 × 2300 × 2650 mm. For frequent short-distance transfers within a solar farm, the crawler structure is more adaptable than a wheeled chassis to dirt roads, grass, and gravel surfaces; the 400 mm track shoes serve to distribute ground pressure, but the actual traction still depends on soil type, moisture content, and slope.
For hole alignment, the data specifies dual-cylinder left and right swing arms and 50 cm forward and backward telescopic compensation, with a mast pitch range of 120°. This combination means that after the machine stops, position corrections can be made within a certain range laterally and longitudinally, and different drilling postures can be accommodated through the mast angle without readjusting the entire machine at every pile position. For array-arranged sites, this type of adjustment helps separate machine repositioning from fine hole position adjustment.
It should be noted that the left and right swing arms and telescopic compensation cover a limited range. When pile spacing, site elevation differences, and obstacle distribution exceed this range, the machine still needs to move. The data does not provide cycle time data for swing arm angles and telescopic actions, so it is not possible to calculate the hole alignment time per pile position or overall construction efficiency from this; these should be observed during on-site trial drilling.
What to check for single-point large-diameter operations
The PV390 has a reducer torque of 13000 N·m, a drill pipe rotation speed of 90 r/min, a drilling diameter range of 80–600 mm, and a drilling depth of 0–6 m. In operations where the hole diameter approaches the upper limit, torque is an important condition for maintaining rotation, but the data also indicates that the equipment uses chain feed, with feed force continuously provided by the chain. When encountering dense soil, cobbles, or backfill layers, the feed speed must be controlled in coordination with the rotary load.
A wide diameter range does not mean that any diameter can be completed with the same efficiency. Actual hole quality also depends on the drill bit type, drilling tool connections, cuttings removal conditions, and strata structure. The original data does not provide penetration rate data for different hole diameters, nor does it provide specific specifications for matching drill bits. Before procurement, the drilling tool configuration corresponding to the target hole diameter should be confirmed with the supplier based on the project foundation design drawings.

The data also states that after replacing with impact drilling tools, the equipment can be used for construction in strongly weathered rock and rock layers. This only indicates the process direction; the original data does not provide the impact hammer model or impact energy, so it cannot be used to judge drilling efficiency under hard rock conditions, nor should this capability be written as directly applicable to any rock stratum.
To what extent posture adjustment and slope conditions can be covered
Pile positions in mountainous solar farms are often distributed on undulating slopes. The PV390 data specifies a climbing angle of 35°, a mast pitch of 120°, and dual-cylinder swing arms and 50 cm telescopic compensation for adjusting the drilling posture. These features correspond to the need to adjust the hole alignment angle after the machine stops on a slope, as well as adaptation to elevation differences within a certain range.
However, the climbing angle is a value specified in the data and cannot be directly used as a basis for safe travel on any slope. Actual operation must also consider cross slopes, ground slipperiness, soil bearing capacity, and the center of gravity of the entire machine. Before slope construction, the stability conditions of the travel route and working platform should be confirmed. The data does not cover anti-overturning calculations or outrigger configuration, and relevant judgments must be separately verified by the project party and supplier.
Strata conditions determine drilling tools and feed strategy
The applicable geology listed in the data includes soil, loess, clay, cobble sand, backfill waste layers, and, after replacing with impact drilling tools, strongly weathered rock and rock layers. These descriptions correspond to strata types, not commitments regarding hole drilling results.
- Soil and loess: Drilling resistance is relatively low, but hole wall stability is affected by moisture content and density, so attention should be paid to hole collapse and diameter reduction.
- Clay: Bit balling and poor cuttings removal are likely, and adjustments should be made according to drill bit type and feed speed.
- Cobble sand and backfill waste layers: Particle composition is complex, and drill bit bouncing, hole deviation, jamming, and local voids may occur. When abnormal loads occur, the drill should be lifted promptly for inspection.
- Strongly weathered rock and rock layers: Impact drilling tools must be replaced; the specific drilling tool specifications and achievable drilling results are not provided in the data.
The above content shows that the equipment data provides classified descriptions of strata, but does not provide recommended drilling parameters for each stratum. Construction parameters should be determined based on trial drilling and on-site geological data, and empirical values from other projects should not be directly copied.

Power and supporting conditions
The PV390 is equipped with an 85 kW Yuchai four-cylinder engine, uses a triple pump (40 / 40 / 32) and TM09 travel motors, and provides hydraulic power for travel, rotation, chain feed, and mast adjustment. Solar farms are usually far from fixed power sources, so diesel power is suitable for independent field construction. However, during continuous high-load operations, the condition of cooling, air filters, and the fuel system will affect equipment availability; the data only provides these as inspection directions and does not give maintenance intervals.
The equipment itself does not include pile foundation construction attachments for after hole drilling. The data mentions that corresponding attachments can be used for pile foundation construction, but does not list attachment types or interface conditions. Before procurement, it should be clarified whether the project only requires pre-drilling to form holes or also requires subsequent piling processes, and the attachment configuration and process connection should be confirmed accordingly.
Items to be confirmed before procurement
Based on this article alone, it is not possible to determine whether the PV390 is suitable for a specific solar project. The following conditions should be confirmed item by item during the inquiry and planning stages:
- Whether the project is mainly continuous pre-drilling at dense pile positions or a small number of large-diameter foundation holes; the ratio of the two will affect equipment configuration trade-offs.
- Whether the target hole diameter and hole depth fall within the 80–600 mm and 0–6 m ranges, as well as the design requirements for the corresponding pile type.
- Site strata data, especially the distribution depth and thickness of cobble layers, backfill layers, and strongly weathered rock.
- Slope, cross slope, and ground bearing conditions at sloped sites, and whether the 35° climbing angle meets travel route requirements.
- Transport road width, turning radius, and entry height restrictions, and whether the overall dimensions of 5200 × 2300 × 2650 mm can pass.
- Whether piling processes need to be completed after pre-drilling, and whether the corresponding attachments and interface conditions are available.
- On-site fuel supply, maintenance conditions, and operator staffing.
Clarifying these issues before entering the quotation stage makes it easier to judge whether the equipment matches the operation objectives than simply comparing a single parameter.




















