When deep orebody verification holes reach the equipment inquiry stage, they are most easily simplified into one question: how deep to drill, and what size rig to use. This question omits the preceding variable—core size. For the same core drill, switching to different diameter drill rods and core barrels significantly changes the reference drilling depth, and the drill string weight, run length, winch load, and mud requirements also change accordingly. Only after core size is defined does hole depth have a comparable basis.
Why core size comes before hole depth
The purpose of a verification hole is to obtain continuous core that supports geological judgment. Core size affects core diameter, sample volume, and the operability of subsequent testing, and directly influences the drill string assembly and rod specifications. Once the size is increased, the drill string load per unit depth increases, and the equipment's margin for hoisting, rotation, and wireline coring is consumed simultaneously. Therefore, treating "how deep the verification hole should be drilled" directly as an equipment capability item often leads to the discovery after drilling starts that a certain hole section requires downgrading the core size or staged construction.
A more reliable sequence is: first confirm the core size and target formation depth required by the geological design, then compare with the equipment's reference drilling depth at that size, and finally verify transport, power, water supply, and downhole management conditions.
For the same equipment, the reference depths for three core sizes are not the same
Taking the split modular hydraulic model CR1200P under the core drill category on this site as an example, its published data provides reference drilling depths by core size:

| Core size | Reference drilling depth |
|---|---|
| BQ | 1500 m |
| NQ | 1200 m |
| HQ | 700 m |
These three values cannot substitute for one another. If the design uses NQ coring, 1200 m is the reference value in the data; if the target formation requires HQ size, the reference depth drops to the 700 m level. Conversely, if the project only requires BQ size, the equipment's depth margin will be greater. Selection discussions should be conducted with a specific size, rather than reporting only a hole depth number.
The data also states that these are reference drilling depths; actual drilling efficiency, achievable depth, and core recovery are affected by formation, downhole tools, drilling angle, and operating methods, and site conditions shall prevail.
What kind of site access constraints does the split structure address
Deep verification holes are mostly located in mining areas with preliminary control but limited road conditions. Whole-machine transport places high demands on road width, turning radius, and lifting conditions, while the CR1200P adopts a split modular design. The data provides reference weights for each module: power unit 180–260 kg, control unit 160 kg, hydraulic oil unit (including oil) 160 kg, mud unit 210 kg, total weight 1880 kg. This means the equipment can be transported to the site in batches according to site transport capacity, but the work of sequential assembly, checking hydraulic interfaces, and mechanical connections item by item still remains at the drill site.

The split design brings flexibility in the site access phase, not the disappearance of transport difficulty. Slope, lifting points, assembly site, and spare parts supply still need to be planned before drilling starts, and this is especially important to implement in advance in mountainous and forest mining areas.
For continuous deep-hole coring, winch and drill string management cannot rely solely on hoisting force
The CR1200P has a hoisting force of 130 kN, thrust of 67 kN, maximum torque of the power head of 1360 N·m, and maximum rotation speed of 1500 rpm. For kilometer-level boreholes, these values provide operating margin, but downhole management relies more on process control: changes in hole deviation, hole wall stability, and drill rod friction often limit footage earlier than the equipment's rated capacity. If lifting resistance continues to increase, the data recommends timely circulation, tripping out for inspection, or hole wall treatment, rather than simply increasing hoisting force to pull hard.
The wireline winch has a rope capacity of 1400 m, equipped with 6 mm steel wire rope, and a lifting speed of 116 m/min. In deep holes, the inner tube lifting distance is long and the wire rope is used frequently, so periodic inspection and replacement records should be established for broken wires, wear, indentation, and rope end connections. This belongs to supporting management and cannot be directly inferred from equipment parameters as actual service life.

Circulation, power, and angle must be checked together
- Mud unit: plunger high-pressure pump, flow rate 150 L/min, pressure 7 MPa. In deep holes, rock cuttings must be carried over long distances, and the mud also serves cooling, lubrication, and wall protection; when encountering loss, water-bearing fractures, or broken zones, mud properties need to be adjusted according to changes in return water and pump pressure.
- Power: diesel engine power requirement ≥147 kW, or a combination of 30 kW × 4 electric motors. Remote mining areas rely more on independent power and fuel supply; fixed platforms with stable power can evaluate electric options, and the site conditions corresponding to the two are different.
- Drilling angle: 45°–90°. If the verification hole needs to be arranged along the orebody dip, the angle range should be confirmed together with the hole layout, rather than defaulting to a vertical hole.
Items still to be confirmed with the supplier before purchase
The above data can support judgment on core size and depth tiers, but it is not sufficient to directly conclude that a certain project is definitely suitable for this model. When inquiring, it is recommended to provide: drilling purpose and target formation depth, design core size, target hole depth and diameter, drilling angle, expected formations and broken zones to be penetrated, site transport conditions and lifting capacity, power supply or fuel supply method, and supporting requirements for drill rods and core barrels.
At the same time, the supplier should be asked to verify: whether the drill rod interface under the selected core size matches the maximum applicable drill rod diameter of 114 mm, the number of modules and actual transport unit division, the time and tools required for on-site assembly, and the spare parts list and supply cycle. Before these conditions are clarified, the hole depth number can only serve as a preliminary screening basis and should not be used as the final configuration conclusion.