How piles are arranged in a solar site is often determined at the foundation design stage. For pile driving equipment, the difference brought by this layout is direct: when piles are dense, one stop position must cover multiple holes; when piles are dispersed, the equipment spends more time on moving and positioning. The same machine faces different action priorities under these two organization methods. Below, using the PV390R data as a clue, we break down the focus points under the two pile layout conditions.
First distinguish whether piles are dense or dispersed
Dense usually refers to array-type solar sites where piles are arranged in rows and columns at fixed spacing, adjacent pile points are close, and the equipment can continuously process multiple holes near one stop position. Dispersed means points are irregularly distributed, spacing is large, or mountainous sites are constrained by terrain, requiring longer movement between holes. These two situations impose different requirements on the equipment and cannot be judged solely by "can it drive."
It should be noted that dense and dispersed are relative concepts; specific spacing depends on project design. The data does not provide applicable limits for pile spacing, so this article only discusses action division and does not give conclusions such as "within how many meters counts as dense."

When piles are dense, hole alignment adjustment does more work
In densely arranged sites, if every pile point relies on machine movement for alignment, repeated chassis start-stop and fine-tuning will consume a lot of time. Several functions listed in the PV390R data correspond precisely to reducing such machine movement:
- 360° rotation: The upper working mechanism can adjust direction around the chassis, covering pile points in different orientations from one stop position, reducing turning and repositioning.
- Dual-cylinder left-right swing arm: After the chassis is stabilized, lateral correction of the drilling position is performed; combined with rotation, major direction adjustment is completed first, then fine alignment.
- 500 mm telescopic compensation: Used for front-back fine adjustment to compensate for deviation between chassis position and pile point.
Together, these three form a division of labor: "machine positions in the general direction, working mechanism aligns holes in detail." The denser the piles, the more chassis movements this division can replace. However, the data does not specify how much repositioning time can be saved; actual results depend on pile spacing, site flatness, and operation method, and efficiency cannot be inferred from this.
When piles are dispersed, relocation and positioning become the main links
In sites with dispersed piles, the equipment spends more time moving from one point to the next. The PV390R uses a crawler chassis with 400 mm track shoe width and a rated climbing angle of 35°, and can travel on dirt roads, grass, gravel, and general unpaved construction surfaces. These conditions correspond to short-distance movement within the site and general slope passability.

But dispersed piles also mean that after each positioning, possibly only one hole is processed, so rotation and swing arm have relatively limited use. At this time, more attention should be paid to the stability of chassis travel, site bearing conditions, and whether mast posture adjustment after positioning is quick. The 120° mast tilt is useful on slopes or when inclined drilling is needed, but the data does not provide specific operation time under different slopes; the actual adjustment method should be confirmed with the supplier before purchase.
Action comparison under the two pile layout conditions
| Focus item | Dense piles | Dispersed piles |
|---|---|---|
| Main time expenditure | Hole alignment and fine adjustment | Travel, relocation, and positioning |
| Role of rotation and swing arm | Reduce machine repositioning, cover multi-directional pile points | Relatively limited; more reliant on chassis movement |
| Mast tilt | Used for posture fine-tuning within the array | Used for positioning adjustment on slopes and irregular sites |
| Conditions to verify | Pile spacing, site flatness, working radius | Travel route, ground bearing, slope and cross slope |
This table only illustrates the action emphasis under the two conditions and does not mean the equipment is necessarily more efficient in a certain type of site. Actual construction is also affected by pile type, hole diameter, strata, and construction organization.
Drilling capacity is the same, but strata constraints cannot be ignored
Regardless of whether piles are dense or dispersed, the PV390R's drilling parameters are the same: drilling diameter 80–600 mm, drilling depth 0–6 m, reducer maximum torque 13000 N·m, drill pipe speed 90 r/min, chain feed, and an 85 kW four-cylinder engine. These values determine that it is shallow-layer solar foundation pre-drilling equipment, not a water well drill, and does not undertake deep-hole tasks.

The data mentions that soil and loess are usually easy to drill, but moisture content and density affect hole wall stability; clay requires attention to bit balling and cuttings removal; pebble sand, gravel, and backfill layers are prone to bit bouncing, hole deviation, and jamming; after replacing with impact drilling tools, it can be used for strongly weathered rock and rock layers, but the original data does not provide impact hammer model and impact energy, so no additional judgment can be made on hard rock efficiency. Whether piles are dense or not does not change these strata constraints.
Conditions to confirm before selection
- Pile layout drawing and typical pile spacing, to judge roughly how many holes one stop position covers.
- Site flatness and slope height difference; the 35° climbing in the data is a nominal value, and actual conditions also depend on cross slope, wetness, and center-of-gravity changes after rotation.
- Target hole diameter, hole depth, and pile type, to confirm whether they fall within the 80–600 mm and 0–6 m range.
- Strata data, especially the distribution of backfill, gravel layers, and strongly weathered rock.
- Whether inclined drilling is needed, and how mast tilt is adjusted in actual operation.
- Obstacles within the working radius; 360° rotation requires confirming no people, vehicles, or overhead lines nearby.
Project information to provide when requesting a quote
If preparing to request a quote for this type of equipment, it is recommended to also explain the pile layout organization: whether it is array-type dense arrangement or dispersed points, typical spacing, whether the site is flat or sloped, target hole diameter and depth range, approximate strata composition, and on-site transportation and entry conditions. The overall dimensions in the data are 5200 × 2300 × 2800 mm, and track shoe width is 400 mm; these can serve as references for transportation and site planning. Dense and dispersed piles correspond to different action priorities; only by clearly stating the project conditions can the supplier judge how much role rotation, swing arm, and telescopic compensation can play in your site.