When drilling a small-diameter water well beside a village road, between orchard rows, in a courtyard or at the edge of a field ridge, what usually stalls progress is not whether the drilling depth is sufficient, but whether the rig can continue past the village entrance, whether it can extend its outriggers beside the well location, and whether the drill pipe will hit tree canopies or eaves when raised. Checking these conditions in sequence is more effective than first focusing on the drilling depth figures in the rig specifications.
Below, using a 220 m-class mini crawler water well rig as a reference, the common constraints of water well construction on small sites are used to organize a pre-entry check sequence. The dimensions, tonnage and process parameters in this article all come from verified data for this model; unconfirmed site conditions are listed separately.
Step 1: Check road and transfer conditions first
The width, turning radius, bridge and culvert load capacity and road surface structure of village roads and orchard access routes determine whether the rig needs secondary transfer by flatbed truck and whether the tracks can travel directly to the well location.
- The overall dimensions are approximately 3950 × 1750 × 2250 mm, the whole machine weighs about 4.7 T, and the loading width is 2.6 m. When checking village road width, passing points and village-entry bridges and culverts, consider the total width and total weight of the transport vehicle plus the rig together, not just the rig itself.
- The crawler chassis travel speed is about 2.5 km/h, and the maximum gradeability reference is 30°. This gradeability value is suitable for judging short entry slopes; whether the rig can actually pass still depends on how slippery the road surface is, the slope length and whether the mast is in the transport position.
- Whether the rig needs to work continuously across villages or townships affects the choice of transport method. The loading tie-down points, the center of gravity after the tracks are on the truck and height restrictions along the route are items that need to be confirmed with the transport provider before entry.
If the village road is only wide enough for small vehicles, or the orchard access road is soft dirt, it is advisable to first confirm whether the rig can be transported in sections and whether temporary access mats are needed. The data only gives the machine dimensions and weight and does not cover the traffic conditions of all rural roads.
Step 2: See whether the rig can stand steady beside the well location
The second issue in small-site construction is positioning. Between orchard tree rows, inside courtyard walls and at the edge of field ridges, there is often not much level space.

This model is equipped with 1.4 m high outriggers for support and leveling. On soft ground, add bearing pads to prevent the outriggers from sinking; before opening the hole, confirm the stability of the whole machine and the mast direction. The 2.6 m mast requires a certain clearance after it is raised. If there are tree canopies, power lines or shed frames above the well location, measure the clearance height before entry rather than judging on site.
The crawler structure has good traction on dirt roads, gravel roads and generally uneven ground. However, on wet grassy slopes, soft ground after rain and slopes, traction and the machine's center of gravity change at the same time. During transfer and positioning, the mast should be in the safe transport position, and the outrigger extension sequence and bearing pad layout should also be arranged in advance.
Step 3: Arrange wellhead operations according to hole diameter and well casing size
The hole diameter of a small-diameter water well is not an isolated number. The drilling diameter range of 140–254 mm corresponds to the matching relationship among well casing specifications, submersible pump outer diameter and expected water yield.
- First determine the well casing and submersible pump dimensions, then judge whether the open-hole diameter leaves sufficient annular clearance.
- During well completion, screen pipes and sealed intervals also need to be set according to the aquifer position. This part depends on local hydrogeological data and cannot be determined by equipment parameters alone.
- Space for cuttings discharge, return water and casing running operations must be reserved near the wellhead. When working beside a village road, the temporary storage location for mud or rock cuttings should be marked out in advance to avoid occupying the traffic lane.
The data gives the drilling diameter range but does not recommend a hole diameter for a specific formation. The specific match among hole diameter, filter material, well casing and water yield should be confirmed according to the project's hydrogeological data and well completion design.

Step 4: Determine which drilling process to use
This model supports water-air dual-purpose drilling. The significance of this feature is that the same rig can select a process according to formation conditions, rather than relying on one process for all formations.
| Formation condition | Key concerns | Preparation needed in advance |
|---|---|---|
| Soil, clay, loose overburden | Hole stabilization and cuttings discharge | Water drilling support equipment, hole cleaning arrangements |
| Sand layer, sand-gravel layer | Hole collapse, drilling tool burial, hole diameter enlargement | Hole wall protection, casing follow-up plan |
| Weathered rock or relatively intact rock | Coordination of percussion, rotation and cuttings discharge | Down-the-hole hammer, drill bit, air compressor |
| Fractured zone, fissured formation | Air leakage, block falling, stuck drilling | Reduce penetration rate, continuous hole cleaning, casing or staged treatment |
When using down-the-hole hammer drilling, the reference working air pressure given in the data is 1.7–2.5 MPa and the air consumption is 17–31 m³/min. When the hole diameter increases, the rock becomes harder or the altitude rises, the air compressor displacement requirement will be higher. Therefore, the air compressor should be selected according to the actual down-the-hole hammer specifications, not just by pressure alone. Water-air dual purpose is a process choice, not a simple switch; hole wall stability, cuttings discharge and formation hardness must all be considered together.
Step 5: Match the drilling tools and rotation parameters
This model has a rotation torque of 3400–4700 N·m, a rotation speed of 45–70 rpm, a lifting force of 13 T, a single feed length of 3.3 m, and can use 1.5 m, 2.0 m and 3.0 m drill pipes, with drill pipe diameters of Φ76 or Φ89.
- Drill pipe length and single feed length should be considered together. A 3.3 m single feed with 3.0 m drill pipes gives a different number of pipe connections than with 2.0 m drill pipes, but actual efficiency also depends on formation, hole diameter and operating method.
- Rotation parameters should match the drill pipe, drill bit, down-the-hole hammer and formation. Stable rotation speed can be maintained in intact rock; in fractured zones or when resistance increases, rotation speed and feed should be appropriately reduced.
- The 13 T lifting force is used for routine tripping of drill pipes and some casing operations. If drill pipe pulling resistance continues to increase, return water suddenly decreases or the drilling tools rotate poorly, first check the hole wall, cuttings discharge and drill pipe condition, then consider hole cleaning, slow lifting or casing treatment. It is not recommended to directly use the maximum lifting force to pull hard.
The fast lifting speed of 30 m/min and fast feed speed of 60 m/min are mainly used for rapid movement of the power head and drill pipe handling and cannot be equated with actual drilling speed.

Step 6: Check power and site conditions together
The equipment uses a 48 kW diesel engine. Diesel power allows independent construction on sites without a fixed power grid, making it suitable for relatively remote agricultural and livestock environments. Before entry, still check the fuel supply method, whether the site allows long-term equipment operation, and the impact of working hours on the surroundings.
If pneumatic drilling is used, the air compressor, air hoses and lubricator and other support equipment need separate transport and placement arrangements. Water drilling support involves water source and cuttings discharge arrangements. These are conditions outside the rig itself; the data does not give a fixed configuration, and they need to be determined by project.
Information recommended for preparation before entry
When asking the equipment supplier for a quotation or confirming the configuration, organizing the following information is more useful than simply asking "how deep can it drill":
- Drilling purpose: farmland irrigation, orchard water use, household domestic water well or livestock farm water use.
- Formation data: overburden type, whether sand-gravel layers, weathered rock or fractured zones are encountered, and well completion records of existing local wells.
- Target hole depth and diameter: well casing specifications, submersible pump dimensions and expected water yield.
- Drilling method: mainly water drilling or requiring pneumatic drilling, and whether a down-the-hole hammer and air compressor are prepared.
- Entry conditions: village road width, bridge and culvert load capacity, orchard access routes, well location clearance and ground hardness.
- Water, power and air supply conditions: water source location, fuel supply, air compressor placement space.
- Support needs: drill pipe specifications and length, casing, drill bits, air hoses, etc.
The features of this rig are concentrated in its compact body, crawler travel, water-air dual purpose and 220 m-class drilling depth range, making it suitable for village roads, farmland, orchards and other sites with limited space. However, whether it is suitable for a particular well still depends jointly on the formation, hole diameter, well casing design and on-site access conditions. The maximum drilling depth of 220 m is the rig's nominal capability and cannot be directly understood as the completed well depth achievable in any formation; the actual well depth should be determined according to local hydrogeological data and the aquifer position.




















