In the shallow reconnaissance phase, holes are often close to existing roads, and hole depth and core size requirements are relatively loose, so whether equipment capability is sufficient is not easily exposed. After shifting to deep verification, hole depth increases, core size may move from BQ or NQ to HQ, and hole sites may fall in mountainous areas with limited road access. The same equipment set must then handle longer drill strings, heavier drilling tools and higher transport and organization demands. At this point, agonizing over "whether to switch to a machine with a larger depth rating" is often too vague. It is more useful to first distinguish: is core size the limiting factor, are transport and assembly the bottleneck, or is there insufficient margin in the hydraulic and circulation systems?
The following uses verified information for a 1000 m-class portable split fully hydraulic core drill as a reference to explain the decision order. It is not the only answer; whether it applies depends on the conditions listed in this article, which still need to be verified on site.
First Distinguish the Phase Goal: Reconnaissance Looks at Coverage, Verification Looks at Evidence Depth
Shallow reconnaissance usually requires a number of holes and anomaly coverage. Hole depth is limited, and a smaller core diameter can still meet logging and assay needs. Deep verification must answer questions such as deep extension of the orebody, continuity of mineralization and alteration zoning. Holes must be drilled deep, and core information must be continuous and comparable. The equipment requirements of the two do not overlap:
- The reconnaissance phase cares more about fast site access, fast relocation and low cost per hole;
- The verification phase cares more about depth capability, core size, hole deviation control and drilling tool handling over long hole sections;
- The two phases in the same mining area may share equipment, or equipment may be reassessed when shifting to verification.
Therefore, the branching point in equipment judgment is not "whether hole depth has reached a certain number," but whether core size, drilling angle, formation complexity and site accessibility change at the same time.

Core Size Determines How to Read the Depth Rating
The reference depths given for this model are BQ 1150 m, NQ 1000 m and HQ 550 m, with drilling angles of 45°–90°. These figures must be read together: as core diameter increases, the achievable reference depth drops significantly. If deep verification requires HQ core to meet logging or testing needs, equipment capability cannot be understood according to the BQ reference depth. Conversely, if verification holes are mainly NQ, both the BQ and NQ ratings still leave margin for handling complex downhole sections.
"Reference depth" is a documentation statement, not the actual completed hole depth under any formation. Complete hard rock, fractured zones, water-bearing fissures and reducing sections have very different effects on depth and penetration rate. The actual achievable hole depth should be based on site conditions and the drilling tool assembly.
| Core size | Reference depth | Meaning for judgment when shifting to deep verification |
|---|---|---|
| BQ | 1150 m | Small diameter, greater depth margin, suitable for deep holes focused on logging and assay |
| NQ | 1000 m | Common verification hole diameter; must be assessed together with formation and drilling tools |
| HQ | 550 m | Large diameter, reference depth drops significantly; compare carefully for deep holes |
If the designed depth of a verification hole exceeds the HQ reference depth, or if the core size must be changed in a deep hole section, then diameter reduction, casing and drilling tool matching must be considered together at the planning stage. These cannot be answered by the equipment specification table alone.
Site Accessibility: Split Transport First, On-Site Assembly Second
Deep verification holes often fall in prospective areas not covered by shallow reconnaissance, where road conditions may be worse. The power unit, control unit, hydraulic oil unit and mud unit of this model can be transported separately. Reference module weights are 180–260 kg for the power unit, 145 kg for the control unit, 160 kg for the hydraulic oil unit (including oil) and 95 kg for the mud unit, with an overall weight of 1640 kg. The significance of the modular design is to break site access difficulty down from "whether the whole machine can travel on the road" into "whether each transport unit can pass."

But this does not mean it can enter any mountainous area. How narrow a road the modules can pass, whether manual or mechanical handling is needed, and how large a platform is required for on-site assembly still depend on the actual route and hole site conditions. The documentation gives module weights; the transport route, lifting method and flatness of the assembly site must be confirmed separately for each project.
Power and Circulation: Sustained Conditions for Long-Cycle Construction
Deep hole verification is often not a job that ends in a few days. This model requires diesel engine power of ≥132 kW, or alternatively a 30 kW × 3 electric motor configuration. Mining areas far from the grid usually organize around diesel power, while mine platforms with stable power supply can evaluate the electric option. The fuel supply, cable laying and maintenance resources for the two power options differ and must be confirmed according to site conditions.
The hydraulic system has a main pump flow of 200 L/min, pressure of 25 MPa and a main oil tank of 200 L. During long-cycle drilling, hydraulic oil contamination, filter clogging and system temperature rise will gradually affect motion stability. The documentation does not give oil change intervals or maintenance intervals; inspection procedures should be established according to manufacturer documentation and site operating conditions.
The mud unit is a plunger high-pressure pump, hydraulically driven, with mud flow of 100 L/min, pressure of 7 MPa and mixer capacity of 1.2 m³/min. As hole depth increases, the transport distance for cuttings becomes longer, and lost-circulation zones and water-bearing fissures also change the return water state. The mud system must be adjusted according to return water, pump pressure and core condition, not simply by increasing pump pressure.
Downhole Handling: Pulling Force and Wireline System Are Only One Condition
The power head has a maximum torque of 1100 N·m, maximum speed of 1250 rpm, thrust of 67 kN and pulling force of 130 kN. As hole depth increases, drill pipe weight, hole wall friction and hole deviation become more significant. Operation requires adjusting bit weight, rotation speed and flushing fluid according to torque and pull-out resistance. Pulling force provides handling margin; reducing downhole accidents still mainly depends on controlling hole deviation, maintaining circulation and promptly handling unstable hole sections.
The winch system uses 6 mm wire rope with a rope capacity of 1200 m, empty drum lifting force of 14.5 kN, full drum lifting force of 6.9 kN and lifting speed of 116 m/min. Deep hole wireline coring requires attention to wire rope fatigue, rope end fixing and spooling. These are inspection directions; specific replacement criteria should be based on manufacturer documentation.
Checklist Worth Verifying Item by Item Before Purchase
- Drilling purpose and phase: whether it is a reconnaissance coverage hole or a deep verification hole; the design depth and target horizon of verification holes.
- Core size: the proportions of BQ, NQ and HQ, and whether diameter reduction is needed in deep hole sections.
- Drilling angle: the actual inclination of each hole within the 45°–90° range, and the effect of inclined holes on drilling tools and lifting.
- Formation data: distribution of complete hard rock, fractured zones, aquifers and lost-circulation sections, to determine circulation and wall protection plans.
- Site accessibility: transport route width, handling method for individual modules and area of the on-site assembly platform.
- Power conditions: whether grid power is available, diesel supply distance and whether the electric option requires supporting power supply capacity.
- Supporting materials: reserve quantities of drill pipes, core barrels, bits, wire rope and mud materials.
- Items to be confirmed: the actual drilling depth and coring performance of this model in the rock formations at the project site must be verified by both supplier and buyer together with the drilling tool assembly and construction organization.
Clarify these questions before requesting a quotation so the supplier can judge whether the model matches, rather than simply quoting a depth figure first.