Engineering holes such as slope anchoring holes and foundation pre-drilling holes often fall in medium-to-high hardness rock formations. When rotary drilling struggles to advance, DTH drilling is often the preferred process route. But hard rock is only one prerequisite; whether the hole positions can be laid out on site, whether the equipment can stand securely, and whether compressed air can be supplied often determine equipment selection earlier than "how hard the rock is."
Below, using verified data for a 30-meter-class crawler hydraulic DTH drill as an example, we check site conditions item by item to explain which requirements can be addressed at this equipment level and which still need separate confirmation.
Answering the core question first: under hard rock, what usually gets stuck first
Hard rock conditions have an intuitive answer: the drilling method must shift from rotary to DTH percussion. But what really affects whether equipment can enter the site is often several other items.
- Whether there is enough space around the hole location to position the crawler undercarriage and complete mast and drilling tool movements.
- Whether the hole direction is vertical, inclined, or lateral, and whether the mast and swing angle can cover it.
- Whether there is a suitable air compressor on site and whether its air output can match the DTH hammer.
- Whether the hole diameter range falls within equipment capability and whether the bit and drill pipe are matched.
If any of these four items does not hold, looking only at "whether it can drill hard rock" is not enough to support selection. Each is expanded below.
Hole location site and undercarriage clearance
Slope anchoring often starts from an already graded work platform, while foundation pre-drilling mostly occurs at equipment foundations, guardrail piles, or short pile locations. The common features of these two scenarios are scattered hole positions, shallow single-hole depth, and frequent machine repositioning.
The equipment uses an engineering rubber crawler undercarriage, with overall dimensions of approximately 3200 × 1200 × 1850 mm, overall weight of about 2500 kg, and travel speed of 5–10 km/h. A body width of about 1.2 m is a reference dimension that can first be checked for passage conditions in some plant areas, fenced construction sites, and narrow construction passages; rubber tracks are relatively friendly to paved surfaces and are also suitable for short-distance movement along construction access roads.

But dimensions are only a reference, not a guarantee of site entry. Turning radius, ground bearing capacity, underground pipeline locations, and equipment placement stability on slopes must all be confirmed on site before work begins. During slope construction, platform stability and rockfall risks should be addressed before equipment enters the site; work should not be carried out directly on unstable slopes.
Which category do drilling orientation and hole depth fall into
Slope anchoring holes include vertical holes, inclined holes, and even some lateral holes. The equipment has a swing angle range of 18–180° and tilt adjustment capability, with a mast stroke of 3.2 m and effective stroke of 2.2 m, which can cover the orientation adjustment needs of vertical, inclined, and some lateral holes.
It is important to distinguish that the data only states tilt adjustment capability and does not give a specific angle range. If the project design hole direction exceeds the common inclined hole range, the final production configuration and technical confirmation documents should prevail; one should not infer that any angle can be constructed solely from the swing angle range.
Regarding hole depth, the equipment has a maximum drilling depth of 30 m and is positioned for engineering short holes and medium-shallow holes, suitable for slope anchor bolt holes, anchor cable holes, drainage holes, foundation pre-drilling holes, and short quarry holes. It is not deep water well equipment, and the nominal 30 m drilling depth should not be understood as a hole depth that can be reliably achieved in any formation.
Compressed air: an unavoidable supporting condition for DTH drilling
DTH drilling relies on compressed air to drive the DTH hammer and discharge cuttings, and air supply capacity directly affects whether drilling can continue. This condition often must be secured before equipment selection, rather than being supplemented after the machine arrives on site.

The equipment data gives a reference air consumption of about 8 m³/min. In the original table this value is marked as 8 m²/min, which is interpreted as m³/min according to the common unit for compressed air flow, and the final value should be confirmed with formal technical documentation. When selecting an air compressor, it should also be checked together with DTH hammer specifications, drilling diameter, and hole depth, not just a single number.
In dry hard rock, the amount of rock dust is large, and a dust collector or water mist dust suppression system can be configured according to the project. During drilling, if rotary resistance continues to increase, return cuttings decrease, or the bit jumps noticeably, drilling should be stopped for inspection rather than continuing to force advancement.
Drilling tools and hole diameter: matching within capability
The equipment has a drilling diameter range of 76–280 mm and maximum rotary torque of 3500 N·m. This hole diameter range covers most engineering anchoring holes and foundation pre-drilling holes, but when the same machine drills small versus large diameters, the selection of DTH hammer and bit differs, and the required air supply also differs.
Construction configuration usually includes a DTH hammer, bit, drill pipe, casing tools, air compressor, high-pressure air hose, oil mist lubricator, and dust collection or suppression device. The matching relationship between drilling tool interfaces, DTH hammer specifications, and the main machine is not listed item by item in the data and should be confirmed separately before purchase; one should not assume that any specification of drilling tool can be directly used.
Under hard rock conditions, DTH hammer lubrication and bit wear inspection should be included in daily operations. Actual penetration efficiency is jointly affected by rock hardness, abrasiveness, hole diameter, air supply capacity, and operating method, and cannot be directly calculated from equipment parameters.

Which formation conditions require extra margin
The data gives an applicable rock hardness of about f = 8–24, covering medium-to-high hardness rock formations such as limestone, granite, sandstone, and basalt. The following situations deserve separate consideration during the planning stage:
- Weathered rock, soil-rock mixed layers, and upper loose overburden can make hole walls unstable, requiring reduced advance speed and, depending on conditions, casing or starting drilling tools to stabilize the hole.
- Fractures and broken zones are prone to block falling, air leakage, and stuck drilling; continuous hole cleaning should be maintained and excessive advance should be reduced.
- If high-pressure air line pressure is abnormal or return cuttings suddenly stop, drilling should be stopped for inspection first, and forced advancement should not continue.
These are process-level condition judgments; the data does not provide construction parameters for specific formations, and the actual plan should be determined in conjunction with on-site geological data.
Items to confirm before purchase
The equipment data also includes one optional item: a 36.8 kW diesel engine is optional. Whether the power configuration is supplied with the complete machine and what the on-site power supply conditions are should be clarified during the inquiry stage.
In addition, the specific angle range of the swing angle, drilling tool interface specifications, and matching parameters between the DTH hammer and air compressor are not expanded item by item in the data and are items to be verified.
When inquiring, it is recommended to provide: drilling purpose (slope anchoring, foundation pre-drilling, or other engineering holes), rock type and hardness estimate, target hole depth and diameter, hole direction requirements, entry passage dimensions and ground conditions, and available on-site air compressor specifications and water/power conditions. This information determines whether the equipment configuration can match the site; looking only at the machine name or a single line of parameters is not enough to complete selection.