Small drilling teams often do not drill one well from start to finish, but two or three wells in one village and four or five in an orchard, with well sites scattered among village roads, field ridges, and courtyards. The organizational difficulty of such work is not how deep a single well is, but that every time you move to a new well site you have to recalculate: whether the equipment can get in, whether the drill pipes are sufficient, what powers it, and whether the completed well diameter matches the well casing. Clarifying these requirements first and then looking at equipment information is more efficient than choosing a model first and then finding reasons for it.
First distinguish "single-well requirements" from "relocation requirements"
In projects with scattered well sites, the two types of requirements should be calculated separately; mixing them easily leads to selecting equipment that is too large or too small.
- Single-well requirements: target well depth, completed well diameter, formation type, well casing and submersible pump specifications, and whether casing installation and gravel packing are needed.
- Relocation requirements: road width between well sites, site hardening level, overall equipment weight and dimensions, loading and unloading method, and relocation frequency.
Single-well requirements determine drilling capacity and drilling tool configuration, while relocation requirements determine chassis form and overall dimensions. A common mistake among small drilling teams is to select equipment only based on the deepest well, resulting in an oversized machine that cannot maneuver on village roads and in orchards; or to seek only light relocation, while the drilling tools and lifting capacity cannot handle conventional well depths. The two should be compared in one table.
Understand 120-meter drilling depth with a discount based on actual formation
The maximum drilling depth of this small crawler water well rig in the information is 120 m, with a drilling diameter of 90–230 mm. In the context of scattered well sites, these two values mean covering shallow-to-medium depth water wells such as rural water supply, farmland irrigation, orchards, and farms, not that any formation can be drilled to 120 m.
Actual completed well depth also depends on groundwater level, aquifer location, hole diameter, and construction technology. For projects with a high proportion of intact hard rock or long-term operation near the maximum drilling depth, it is necessary to re-evaluate whether the drilling tools, power, and equipment class match. Before quoting for scattered well site projects, it is best to list the estimated depth and formation conditions of each well site, and check equipment margin against the deepest and most difficult well, rather than estimating by average depth.

Hole diameter range must match well casing and submersible pump
The 90–230 mm drilling diameter covers common completed well diameters for rural domestic water wells and small irrigation wells. Hole diameter selection is not the larger the better: a large diameter increases drilling tool load and cuttings removal volume; a small diameter limits installation space for well casing and submersible pump.
When taking on scattered well sites, it is recommended to first confirm the well casing size and submersible pump specifications planned for each well, then work backward to the required completed hole diameter. If the same drilling team handles both household water wells and irrigation wells, the diameter span may be large; at this time, check whether the drill bit configuration is complete, rather than only looking at the equipment's nominal maximum hole diameter.
Power and travel: site conditions brought by the diesel engine
This model is equipped with a 28 HP diesel engine, providing power for the hydraulic system, rotation, and crawler travel, without relying on a fixed power grid. For well sites such as roadsides in villages, orchards, and remote farms where access to electricity is inconvenient, this is a practical condition.
But diesel power also means fuel supply and daily inspections must be implemented on site: engine oil, cooling, fuel system, and air filter need to be checked according to the information requirements. When scattered well sites are far apart, the amount of fuel and wear parts to carry should be calculated in advance in the relocation plan.
Overall dimensions and weight determine relocation method
The overall weight is about 1.8 T, overall dimensions are about 3000 × 1300 × 1700 mm, and crawler travel speed is 2.5 km/h. The relocation approach corresponding to these data is: short-distance well sites can be moved by crawler self-propulsion, and longer distances require transport by small transport vehicles.

What needs to be confirmed is village road width, orchard row spacing, courtyard gate openings, and load-bearing conditions of field roads. Dimension information can only indicate the overall outline of the machine and cannot replace on-site verification of the access route to specific well sites. During relocation transport, the equipment must also be secured, as noted in the information.
Tower height and drill pipe length correspond to rod changing rhythm
The 1.5 m tower makes the overall working height lower and transport volume smaller, suitable for courtyards and small construction sites with limited space. Supporting drill pipe diameters are 50 / 60 / 76 mm, with lengths of 1.5 m and 2.0 m.
A shorter tower and shorter drill pipes bring convenience in operation and transport, at the cost of higher rod changing frequency than long-stroke models. Single-well depths in scattered well site projects are usually limited, so the impact of rod changing times is relatively controllable; but if a well site depth approaches the equipment limit, the auxiliary time for connecting rods will increase significantly, and this should be included in quoting and schedule planning.
Rotation and lifting capacity should be viewed together with drilling technology
Rotation speed range is 40–70 rpm, lifting force is 16 T, and working pressure is 1.7–3.0 MPa. These values should be understood in combination with drilling tools and formations: soil, clay, sand, and gravel layers have different requirements for hole wall stability and cuttings removal, while weathered rock and alternating soft-hard formations require adjusting operating parameters according to rotation load.
The 16 T lifting force is used for conventional tripping and drilling tool recovery. The information clearly indicates that when abnormal pulling resistance, hole wall shrinkage, or poor cuttings removal occurs, the formation and downhole conditions should be judged first, and it is not recommended to rely solely on maximum lifting force to force handling. This is especially important for scattered well sites: formations may vary between well sites, and operating parameters should be adjusted according to downhole conditions, not one set of parameters for all.

Checklist to confirm item by item before starting work
The following items should be implemented item by item before inquiry and site entry; parts not covered by the information need to be verified with the equipment supplier or on site.
| Confirmation item | Why confirm | Information basis |
|---|---|---|
| Target depth and formation of each well site | Judge whether it approaches the equipment capacity limit | Information gives maximum drilling depth; actual is affected by formation |
| Completed well diameter and well casing specifications | Corresponds to drilling diameter and drill bit configuration | Information gives 90–230 mm range |
| Roads and sites between well sites | Determines crawler self-propulsion or vehicle transport | Information gives overall dimensions and weight |
| Fuel and daily maintenance conditions | On-site support for diesel power | Information lists inspection items, no intervals given |
| Drilling tool and wear part reserves | Impact of supply interruption during scattered operations | Information gives drill pipe diameter and length configurations |
| Cuttings removal and hole stabilization method | Hole-making requirements for loose layers and gravel layers | Information suggests selection by formation, technology not detailed |
When this equipment direction fits, and when to re-evaluate
According to the information, this equipment is aimed at rural water supply, farmland irrigation, orchards, farms, and small engineering water wells, emphasizing low investment and daily practicality, suitable for conventional drilling projects with scattered hole positions, frequent relocation needs, and limited budgets. If well sites are mainly roadsides in villages, orchards, and farms, single-well depths are in the shallow-to-medium range, and hole diameters correspond to household water wells or small irrigation wells, this configuration direction fits.
Conversely, if the project is mainly intact high-hardness rock layers, or most well sites are near the 120 m upper limit with larger hole diameters, the drilling tools, power, and equipment class need to be re-evaluated. The information itself also states that final drilling efficiency, drilling depth, and completed well results are subject to on-site working conditions, and nominal values cannot be directly treated as the actual capacity for each well.
Information to provide when inquiring
When inquiring with equipment suppliers for scattered well site projects, it is recommended to provide: drilling purpose (domestic water, irrigation, or farming), estimated depth and formation overview of each well site, target completed well diameter and well casing specifications, number and distribution of well sites, access road and site conditions, power and water supply conditions, and whether supporting drill pipes and drill bits are needed. The more specific the information, the more targeted the equipment configuration and supporting recommendations; when formation information is lacking, it should be clearly listed as an item to be confirmed, rather than replacing on-site judgment with nominal equipment capacity.