In ultra-deep water well equipment data marked with a 1,500 m drilling depth, the number itself is often the first thing people notice. But for those who actually organize construction, drilling depth is only an outcome indicator. Whether it can be achieved depends on whether the mast can provide sufficient working height, whether the drill string can be safely run in and pulled out, whether drill pipe make-up and break-out match site organization, and whether rig transport to site has been accounted for in advance. Using a 1,500 m-class telescopic-mast crawler water well rig as an example, this article explains the order in which such data should be read, which fields need to be understood as a group, and which conditions must be separately verified before purchase.
Why read mast and drill string handling before drilling depth
During ultra-deep hole drilling, most auxiliary time is spent on tripping and making up or breaking out drill pipe. The deeper the hole, the greater the drill string weight, and the more pronounced the loads caused by borehole wall friction, casing weight and local sticking. The drilling depth figure only indicates the depth range the equipment is nominally capable of covering; it does not indicate whether the drill string can be run and pulled smoothly at that depth, whether the mast can accommodate the selected drill pipe, or whether the site has space to organize long drill pipe handling.
Therefore, when reading this type of data, mast structure and drill string handling fields should take priority over the drilling depth figure. Mast type determines working height and transport configuration; drill pipe length and diameter determine make-up/break-out frequency and matching drilling tools; lifting force and feed force determine handling margin for the drill string and casing; rotary torque determines adaptability to large-diameter, hard-rock and high-friction hole sections. These conditions are interrelated, and looking at any one alone easily leads to one-sided conclusions.
What processes does the telescopic mast structure change
This model uses a telescopic mast structure, with overall dimensions of approximately 11.5 × 2.6 × 3.5 m and overall weight of approximately 28 t. The role of the telescopic mast can be viewed from two sides: during operation it provides the working height required for deep holes; during transport it improves the overall envelope, reducing the loading and road-clearance difficulties caused by a fixed long mast.
However, a telescopic structure does not mean transport problems disappear automatically. For heavy equipment in the 28 t class transported across regions, it is still necessary to confirm in advance flatbed load capacity, road height limits, bridge load capacity and turning space; 9.6 m drill pipe usually needs separate transport. After arrival at site, space must also be reserved for the air compressor, mud system, drilling tools and materials area. The data gives overall dimensions and weight, but this does not mean the rig can pass directly under any road conditions; this item must be verified against the specific transport route.

Correspondence between drill pipe length and make-up/break-out frequency
The equipment supports 9.6 m drill pipe, with recommended drill pipe diameters of 114 mm or 127 mm. For ultra-deep holes, if short drill pipe is used, the number of make-up/break-out operations increases noticeably with hole depth, and auxiliary time is continuously amplified; long drill pipe can reduce connection frequency, but at the same time places higher demands on site operating space and drill pipe handling organization.
When reading the data, drill pipe length should not be treated merely as a specification number; it should be considered together with mast working height, site layout and lifting capacity. Whether 9.6 m drill pipe can be smoothly made up, broken out, placed and lifted at the wellhead depends on whether the site leaves sufficient space and whether auxiliary winch and lifting organization are matched. The equipment is equipped with a 5 t large auxiliary winch and a 2.5 t small auxiliary winch, which can be used for handling DTH hammers, drill pipe, casing tools and general accessories, but lifting operations must still strictly comply with rated loads and safety distances.
Lifting force, feed force and rotary torque: read the three data groups together
This model has a lifting force of 80 t and a feed force of 16 t. As hole depth increases, drill string weight, borehole wall friction and casing weight all rise; greater lifting capacity provides margin for normal tripping, drill tool recovery and some large-specification casing operations. However, the data also notes that when abnormal resistance occurs, priority should be given to hole cleaning, slow lifting and judging downhole conditions, rather than treating lifting force as a universal means of handling downhole incidents.
The rotary system has a maximum rotary torque of 31,000 / 15,500 N·m and a maximum rotary speed of 70 / 140 r/min. Low speed and high torque are more suitable for large-diameter, hard-rock and high-friction conditions, while higher speed is suitable for stable hole sections with relatively low resistance. The two torque values correspond to different operating conditions and should not be simply understood as two speed gears. During ultra-deep hole construction, adjustments should be made dynamically according to drill string load, cuttings return and drilling tool condition; the values in the data do not constitute fixed construction parameters for any formation.

| Data field | Main corresponding process | Conditions to verify together |
|---|---|---|
| Telescopic mast | Deep-hole working height, transport envelope | Transport route height limits, loading method, on-site assembly space |
| 9.6 m drill pipe | Make-up/break-out frequency, drill string organization | Wellhead operating space, drill pipe handling and lifting capacity |
| 80 t lifting force, 16 t feed force | Tripping, casing handling, weight-on-bit control | Drill string assembly, casing specifications, judgment of downhole resistance |
| 31,000 / 15,500 N·m torque | Rotation in large-diameter, hard-rock, high-friction hole sections | Drilling tool specifications, cuttings return condition, speed selection |
Hole diameter and air supply conditions: supporting items that determine whether a deep-hole plan can be implemented
This model has a hole diameter range of 105–1,000 mm, covering conventional deep water wells, large-diameter groundwater wells, mine dewatering and some large engineering holes. The larger the hole diameter, the higher the requirements for the air compressor, drilling tools, casing, rotary torque and lifting capacity. Actual projects should select a reasonable hole diameter according to the completion objective, rather than configuring to the upper limit.
When using DTH hammer drilling, the recommended working air pressure is 1.65–8 MPa and air consumption is 16–120 m³/min. Deep-hole and large-diameter hard-rock projects have very high requirements for air compressor displacement; pressure and displacement must simultaneously meet the needs of the DTH hammer and bottom-hole cuttings removal, otherwise insufficient impact, difficult cuttings removal and bottom-hole cuttings accumulation are likely. The data gives recommended ranges; the specific matching air compressor should be separately confirmed according to DTH hammer model, hole diameter and hole depth, and the air supply plan cannot be determined solely from the drilling rig data.
Different formations require different drilling methods and wall protection arrangements
The data divides applicable formations into loose formations and rock formations, and lists three drilling methods: top-drive hydraulic rotary drilling is suitable for conventional deep water wells and large-diameter drilling; DTH hammer drilling is suitable for weathered rock, fractured rock and intact hard rock; mud rotary drilling is suitable for loose formations such as soil, clay, sand and gravel layers.
In relatively intact rock layers such as granite, basalt and limestone, medium- and high-pressure DTH hammer drilling can be used; when encountering weathered rock, fractures or fault fracture zones, penetration speed should be reduced, hole cleaning strengthened, and casing, foam or other hole-stabilizing measures used according to actual conditions. For soil, clay, sand and gravel layers, mud rotary drilling, casing or other wall protection methods can be used. For ultra-deep wells, once upper hole sections suffer diameter reduction or collapse, subsequent deep construction is directly affected; therefore, at the opening stage, priority should be given to establishing a stable hole body before entering rock layers and switching to DTH hammer drilling.

It should be noted that the data lists applicable methods and general principles, and does not constitute a construction commitment for any specific formation combination. After entering the main aquifer, water inflow will change downhole cuttings removal and DTH hammer working conditions; during construction, the depth of the main water-producing layers should be recorded, and air supply, hole cleaning and casing methods adjusted according to water volume; at the completion stage, screen pipes, water-stop sections and pump type still need to be designed according to aquifer distribution.
Items still requiring confirmation before purchase
This data can explain the equipment's structural form, main parameters and application direction, but it cannot replace project-level verification. The following items should be confirmed one by one during the inquiry and planning stage:
- Target well depth and completion depth: the nominal maximum drilling depth of 1,500 m does not equal the actual completion depth in any formation; actual well depth should still be determined according to hydrogeology, hole diameter, drill pipe, air compressor and completion design.
- Formation data: the distribution of upper overburden and deep rock layers, fracture zones and aquifer positions determine the opening wall protection method and the timing of drilling method switching.
- Hole diameter and completion structure: 105–1,000 mm is the equipment coverage range; actual hole diameter should comply with the completion objective and casing and screen design.
- Air compressor matching: the pressure and displacement required for DTH hammer drilling must be separately calculated according to hole depth, hole diameter and drilling tool assembly; the 1.65–8 MPa and 16–120 m³/min in the data are recommended ranges.
- Transport and site: the 28 t overall weight, overall dimensions of approximately 11.5 × 2.6 × 3.5 m, and separate transport arrangements for 9.6 m drill pipe need to be verified against specific road and site conditions.
- Water, power and auxiliary equipment: mud pumps, centrifugal pumps, generators and foam pumps are optional accessories; whether to configure them depends on the drilling method and site conditions.
When inquiring, it is recommended to provide the drilling purpose (deep water well, mining water supply, dewatering or geothermal investigation), formation column data, target hole depth and diameter, proposed drilling method, access transport route and site conditions, on-site power and water supply conditions, and the drilling tools and air compressor parameters to be matched. Only with complete data can it be judged whether equipment of this class matches project requirements and which configurations need further adjustment.