The objective of a deep verification hole is usually not simply to drill to a certain depth, but to obtain continuous core for determining whether mineralization extends to depth, whether structures are connected, and how alteration zoning changes at depth. Once the objective is tied to core, equipment conditions cannot be judged by the drilling depth column alone: the coring diameter determines the drill rod series, the planned hole depth determines which reference value to use, the borehole inclination changes the stress on the drill string, and the downhole load in turn constrains torque, lifting force, and winch capacity. Breaking these conditions down in sequence is more useful than choosing the rig with the greatest drilling depth first.
Step 1: Determine the coring diameter before discussing depth
A deep verification hole is meant to answer geological questions, and the coring diameter is first determined by sample requirements. The closer the diameter is to a large specification, the lower the reference drilling depth a given rig can cover. The drilling capability data for the CR1600I is given by specification: reference depth of 2000 m for B size, 1500 m for N size, and 850 m for H size. These three values are not depths that the same hole can reach simultaneously; they are reference ranges under different coring diameters.
- If the verification objective is continuous deep core and a smaller diameter is acceptable, the 2000 m reference value for B size falls within the planned hole depth coverage;
- If the core must support more complete logging or test sampling, N size is commonly used, with a corresponding reference depth of 1500 m;
- If the design uses H-size coring, the reference depth drops to 850 m, and it is then necessary to recheck whether the planned hole depth still falls within that range.
The point of this step is that only after determining the diameter corresponding to the coring objective can one know which drilling depth value to compare against the project. Taking the maximum drilling depth directly as the rig's overall capability can easily lead to expectations that are not met when the diameter changes.
Step 2: Place the planned hole depth back into the corresponding range
The design depth of a deep verification hole is often not a single value but a main hole depth plus several extension holes. During breakdown, the design depth, coring diameter, and termination conditions of each hole should be listed and then compared item by item against the reference drilling depths. The three ranges of the CR1600I—2000 m, 1500 m, and 850 m—correspond to reference capabilities under different drill rod series. The depth actually achievable is also affected by formation conditions, downhole tools, borehole angle, and operating methods, and the data also clearly states that final conditions should be based on actual site conditions.

It should be noted that reference drilling depth is a statement of equipment capability. It does not mean every project must drill to that depth, nor that drilling to that depth will necessarily proceed smoothly. In the later stages of a deep hole, the weight of the drill string, friction, and borehole wall stability continue to change, and these are conditions that construction planning must consider separately.
Step 3: Bring inclined-hole direction into the conditions checklist
Deep orebodies often have a preferred orientation, and a single vertical hole provides limited control over an inclined orebody. The CR1600I supports borehole angles of 45°–90°, allowing holes at different inclinations to be laid out according to orebody attitude and fault direction. Once the angle deviates from vertical, the direction of stress on the drill string changes, and the difficulty of controlling downhole friction and hole deviation also changes. Therefore, in the breakdown sequence, borehole angle is not an item to be added at the end; it should be clarified as soon as the depth range is determined: which holes are vertical, which are inclined, and how the inclination direction corresponds to the exploration line.
After the angle conditions are determined, review whether the rig's feed force and pull force leave room for handling. The CR1600I has a feed force of 63 kN, a pull force of 185 kN, and a gripper through-hole of 150 mm, and is compatible with drill rod systems such as NQ, HQ, PQ, NTW, and HTW. These values correspond to margins for deep-hole drill string control and tool recovery, not a promise of efficiency; the extent to which they can be handled still depends on actual downhole conditions.
Step 4: Torque and rotation speed serve changes in downhole load
The deeper the hole, the greater the drill string weight and downhole friction, and the more obvious the risks of sticking and hole narrowing in complex formations. The CR1600I has a maximum torque of 4800 N·m and a maximum rotation speed of 1500 rpm, with gear ratios of 1:3 / 1:3. The purpose of a wide operating range is to leave room for adjustment at different drilling stages, not to use one fixed set of parameters for the entire hole. Intact hard rock sections, fractured zones, and water-bearing fracture zones have different requirements for rotation speed and bit pressure, and deep-hole operations should not use a single fixed set of parameters for long periods.

Step 5: Calculate circulation and winch together with hole progress
In deep holes, cuttings must be transported over longer distances, and downhole temperature rise, friction, and return-water stability all affect drilling. The CR1600I mud system has a flow rate of 250 L/min and a pressure of 7 MPa, providing circulation capacity for bit cooling, cuttings transport, and borehole wall stability; when facing deep leakage and fractured aquifers, the mud system still needs to be adjusted according to changes in return water. The hydraulic system main pump has a flow rate of 320 L/min and a pressure of 31 MPa, and the auxiliary pump has a flow rate of 160 L/min and a pressure of 23 MPa. During long-term construction, hydraulic oil cleanliness, filter differential pressure, and system temperature rise should be controlled.
The auxiliary time for wireline coring is also directly related to hole depth. The CR1600I winch uses a 6 mm wire rope, with a rope capacity of 1800 m and a lifting speed of 118 m/min. For N-size deep holes at the 1500 m level, the inner tube retrieval distance is long, and winch capacity and speed affect the auxiliary rhythm of each run, so this configuration is more oriented toward continuous deep-hole coring operations.
Step 6: Clarify applicable boundaries and items to be confirmed
After completing the breakdown in the above order, conditions beyond the equipment should also be listed clearly. The CR1600I is a fully hydraulic integrated crawler structure. In the power package data, the engine is a Cummins 6CTA8.3 with a displacement of 8.3 L, rated power of 153 kW, and rated speed of 2000 rpm, and the electrical system is 24 V. The integrated layout reduces repeated connections between modules and is suitable for large exploration areas and long-term site projects, but access roads, platform dimensions, and transport methods still need to be checked against the actual site.

There is one more point in the data that needs explanation: the model title in the last column of the PDF power package table shows “BX1500T,” while the other parameter tables on the same page correspond to BX1600T; this page only organizes the power parameters provided in that column and does not make additional inferences about the difference in model title. Such discrepancies in data should be confirmed with the supplier during selection and should not be judged independently.
The following is a hypothetical scenario used to illustrate the breakdown sequence and does not mean any customer has adopted this equipment: if a deep verification hole is designed with a depth of 1400 m and uses N-size continuous coring, then the 1500 m reference range falls within the coverage; if some of the holes are changed to H-size coring and the design depth is still close to 900 m, then the 850 m reference value must be compared again, and it must be confirmed whether the coring plan needs to be adjusted. Whether it is applicable still depends on actual formation conditions, downhole tools, and site conditions.
| Breakdown item | Corresponding data | Still to be confirmed |
|---|---|---|
| Coring diameter | B/N/H size reference drilling depth 2000/1500/850 m | Correspondence between sample requirements and diameter |
| Hole depth range | Reference drilling depth by specification | Influence of actual formation and downhole tools |
| Borehole angle | 45°–90° | Orebody attitude and hole layout |
| Downhole load | 4800 N·m, 63 kN feed, 185 kN pull | Deep-hole friction and room for incident handling |
| Circulation and winch | 250 L/min, 7 MPa; rope capacity 1800 m | Leakage, aquifers, and mud system |
| Power and site | 153 kW, 24 V, integrated crawler | Access roads, platform, and transport conditions |
Only after completing these six steps are equipment conditions derived from the coring objective rather than inferred backward from a drilling depth number. The difficulty in selecting equipment for a deep verification hole is usually not whether a single parameter is large enough, but whether these conditions can all hold simultaneously in the same hole.