After surface reconnaissance, geophysical and geochemical surveys, and shallow drilling are completed, the project enters a more specific stage: the anomalies have been delineated, but how mineralization extends at depth, whether structures are connected at depth, and whether alteration zoning changes remain unanswered. The holes planned at this point are often not shallow holes; depths range from several hundred meters to around one thousand meters, hole locations are scattered across several anomaly areas, and some holes must be drilled at an angle along exploration lines. Equipment selection is therefore not a question of "is the drilling depth sufficient," but whether several capabilities can be met at the same time: whether the coring diameter is selected correctly, which depth range the planned hole depth falls into, whether an inclined hole direction can be laid out, and whether there is handling margin once downhole loads increase. The breakdown below follows this order.
Step 1: The nature of the task has changed, and equipment conditions change with it
The difference between anomaly verification holes and shallow reconnaissance holes is not the depth figure itself, but the information requirements. A shallow hole may only care about whether mineralization is encountered, while an intermediate-deep hole must obtain continuous core for geological logging, structural analysis, sampling and assay, and judgment of mineralization continuity. This means that core from every run should be recovered as fully as possible, and the number of trips caused by downhole problems should be minimized. Equipment conditions therefore involve at least four groups: the diameter and reference drilling depth corresponding to the coring system, the adjustable range of drilling angle, lifting force and winch rope capacity, and the continuous operating capability of the mud circulation and hydraulic systems.
Step 2: Determine the coring diameter first, then discuss the depth range
The reference drilling depths given in the CR1000I documentation are divided by diameter: B size 1200 m, N size 1000 m, and H size 500 m. These three figures cannot be used interchangeably. If the planned hole depth is around 800 m, the 1000 m range corresponding to NQ diameter still has reference margin; if the same hole is to be drilled deeper, or if the formation requires larger-diameter casing to follow, it is necessary to return to the corresponding range and recheck. When selecting equipment, first determine the coring diameter, then compare the planned hole depth against the reference value for that range; this is more reliable than first memorizing a maximum drilling depth.

The through-hole diameter of the chuck on this model is 127 mm, and the applicable drill rods are NQ, HQ, PQ, NTW, and HTW. Whether the downhole drill string system matches the chuck through-diameter is an item that must be confirmed separately before starting work, and cannot be judged only from the drilling depth range.
Step 3: Inclined holes are not an add-on; they enter the depth judgment
Anomaly verification often requires inclined holes laid out according to orebody attitude, using a reasonable intersection angle to cut through the mineralized zone. The CR1000I supports drilling angles of 45°–90°, and both inclined holes and near-vertical holes can be laid out within this range. However, once the angle deviates from vertical, the stress direction on the drill string changes, and the risks of borehole wall friction and uneven wear of drilling tools rise; at the same depth, the actual load differs from that of a vertical hole. The reference drilling depths in the documentation are given by diameter and are not further divided by angle. Therefore, when planning an inclined hole, the angle should be raised as an independent condition, and the manufacturer should be asked to confirm actual applicability under that combination of angle, diameter, and hole depth; the reference value for a vertical hole cannot be assumed to apply directly.
Step 4: As hole depth increases, lifting force and winch capacity must be considered together
In the intermediate-deep hole stage, what often becomes tight first is not rotation but tripping and handling downhole resistance. The CR1000I provides 63 kN feed force and 185 kN pull-up force; the wireline winch uses 6 mm wire rope, with 1000 m rope capacity and 98 m/min lifting speed. The pull-up force corresponds to the capability reserve for deep-hole tripping and handling stuck tools; the winch rope capacity must be calculated together with the planned hole depth—under wireline coring, insufficient winch capacity directly limits the constructible hole depth. This appears in the documentation as an independent parameter and cannot be inferred backward from the drilling depth range.

It should be noted that 185 kN is an equipment capability value, not the actual tripping load of a specific hole in a specific formation. Drill string weight, borehole wall friction, and flushing fluid lubrication conditions all change the actual demand. During selection, margin should be left according to the most unfavorable case rather than directly comparing the planned hole depth with the capability value.
Step 5: Rotation and circulation conditions for continuous penetration through formations
Anomaly verification holes often must continuously pass through surrounding rock, alteration zones, fault zones, and mineralized intervals, with frequent lithological changes. The CR1000I power head uses gear transmission, with maximum torque of 1200 N·m, maximum speed of 1350 rpm, and hydraulic side shift. For diamond wireline coring, higher speed is used in intact rock to improve penetration, while torque margin is used to cope with broken intervals and resistance changes; the two belong to different operating ranges and cannot substitute for each other. The mud system is 150 L/min at 7 MPa, used to cool the bit, carry rock cuttings, and stabilize the borehole wall; in strongly weathered, broken, or lost-circulation formations, circulation parameters and wall-protection measures must be adjusted according to actual conditions, and the documentation does not give a fixed formula.

Step 6: The integrated crawler layout corresponds to the relocation stage
Hole locations for anomaly verification are usually scattered, and the distance of a single move is not long, but the conditions of mine roads, gravel ground, and mountain platforms change repeatedly. The CR1000I concentrates the power assembly, hydraulic system, power head, mast, winch, chuck, and mud circulation system on the same crawler platform, reducing on-site disassembly and module connection work. This corresponds to construction organization with "frequent hole location changes and the need for continuous advancement," rather than eliminating all installation work—access road width, slope, site bearing capacity, and drilling platform dimensions still must be verified before the equipment enters the site.
Which conditions still require separate confirmation
- The specific construction angle of an inclined hole within the 45°–90° range, and its applicability when combined with the planned hole depth and coring diameter; the documentation does not subdivide ranges by angle.
- Whether the target formation requires casing to follow, and the matching relationship between casing specifications and the chuck through-diameter and drill rod series.
- The specific configuration of bits, core barrels, and drill rods must be determined before starting work according to the target hole depth, hole diameter, and formation conditions; the documentation only gives the applicable drill rod range.
- In deep-hole operations, the inspection intervals for wire rope, chuck, power head, hydraulic filters, and high-pressure lines should be established according to on-site operating conditions.
- Actual drilling efficiency, drilling depth, and core recovery are affected by geological conditions, downhole tools, drilling angle, and operating methods; the documentation does not provide guaranteed values.
Checking these items in order before judging whether the CR1000I is suitable as a working starting point for this stage is closer to actual decision-making than looking at the drilling depth figure first. What truly tests equipment in the anomaly verification stage is whether core recovery continuity, hole direction controllability, and downhole handling margin can all hold at the same time.