Medium-deep water supply projects often do not involve drilling a single hole from start to finish: farm irrigation wells, village and town water supply wells, and mining camp water wells may be scattered across several counties, with hole depths ranging from just over one hundred meters to four or five hundred meters. The first question in equipment selection is usually not "how deep can it drill," but how much effort it takes for the equipment to move between two sites and to set up on one site. This is precisely why the truck-mounted straight mast structure is repeatedly mentioned—it changes not only the chassis form but also how the mast is erected, how drill pipes are connected, and how much space the site must leave.
Below, based on public information on the WRT600, we break down "truck-mounted" and "straight mast" separately to see which needs each corresponds to and what constraints each brings.
Cross-site movement: the truck-mounted chassis reduces loading and unloading steps
When crawler-type or trailer-type equipment relocates, it usually requires flatbed truck transport, followed by unloading, leveling, and unfolding on arrival. For projects with scattered hole locations and short single-well durations, this loading and unloading process can account for a significant proportion of total working hours. The WRT600 uses a truck-mounted chassis, with the mast, power head, hydraulic feed, winch, and operating system integrated on the vehicle. Road relocation is completed by the chassis itself, reducing the number of times the equipment is loaded onto and off flatbed trucks and the corresponding lifting organization.
The data gives an overall weight of approximately 26 T and transport dimensions of approximately 10 × 2.48 × 3.75 m. This means truck-mounted relocation is not "ready to go at any time": road width, bridge load capacity, height limits, and turning radius must all be confirmed before entering the site. Whether village roads, field ridges, and mining gravel roads can bear this tonnage is a condition that must be settled at the selection stage, not something to figure out after arrival.
Straight mast structure: a direct load path, but entry clearance must be calculated in advance
The WRT600 uses a straight mast and does not change mast length through multi-stage telescoping. The positioning of the straight mast in the data is that the structure is relatively simple, maintenance is intuitive, and the overall load path is more direct, making it suitable for continuous rotation, deep-hole drill pipe handling, and high-load water well construction. For medium-deep water supply projects, this means that during prolonged tripping of drill pipes and handling of casing, the mast does not require additional operation of a telescoping mechanism, saving one step in the process.

On the other hand, the clearance requirements during transport and site entry are more explicit. Unlike a telescopic mast, a straight mast cannot be shortened in the transport state, so before project startup, road height limits, site clearance, and turning space must be checked. If the well location is next to an orchard, courtyard, or existing building, this constraint directly affects whether the equipment can approach the hole location.
600 m drilling depth and 140–450 mm hole diameter: first match the coverage range to project goals
The data specifies a maximum drilling depth of 600 m and a hole diameter of 140–450 mm. For medium-deep water supply projects, these figures first answer whether this type of hole falls within the equipment's coverage range, not whether every well must be drilled to 600 meters. Actual well depth should be based on hydrogeological conditions and the depth of the target aquifer, while hole diameter must serve the completion design of well casing, screen pipes, and submersible pumps: agricultural and community water wells usually do not require long-term use of the maximum hole diameter, and only mining and industrial high-flow water supply projects may consider larger well diameters.
If the project's target well depth is significantly below this level, the equipment capacity will have considerable margin, and selection should focus on relocation and completion support; if the target well depth approaches or exceeds 600 m, the drill string assembly, lifting margin, and formation conditions must be verified separately, and feasibility cannot be judged solely by the maximum drilling depth.
Lifting force and dual-condition torque: corresponding to deep-hole drill string handling and different formation resistance
The WRT600 is equipped with 37 T lifting force and 6 T axial pressure, and the rotation system provides dual-condition torque of 15000 / 7500 N·m, corresponding to maximum speeds of 70 / 140 r/min. At hole depths of around 600 meters, the self-weight of the drill pipe, borehole wall friction, and casing weight all increase with depth, and the lifting force provides margin for tripping drill tools and handling some casing operations. The data also reminds that if tripping resistance is abnormal, the problem should first be judged and addressed through hole cleaning and downhole conditions, and one should not rely solely on the maximum lifting force to pull forcefully—this boundary is worth remembering in both selection and construction organization.

The role of dual-condition torque lies in different hole sections: low-speed high-torque is suitable for large-diameter, hard rock, and high-resistance hole sections; the high-speed gear is suitable for stable formations with lower resistance. During construction, adjustments should be made according to rotation load, cuttings return, and drill tool conditions, rather than understanding it as two fixed speeds.
Feed stroke and drill pipe length: the number of pipe connections affects the continuous drilling rhythm
The feed stroke is 7 m and is compatible with 3 m and 6 m drill pipes. 6 m drill pipes reduce the number of pipe connections and facilitate continuous drilling; 3 m drill pipes are more suitable for sites with limited space or ordinary handling conditions. The fast lifting speed of 30 m/min and fast advancing speed of 41 m/min are mainly used for drill pipe operations and power head return, and are not directly equivalent to drilling speed.
This configuration works in conjunction with the straight mast structure: the mast height and feed stroke together determine how long a drill pipe can be connected at one time, and also affect the working space at the wellhead. If the project site is compact and drill pipe handling relies heavily on manual labor, a combination of 3 m drill pipes and a short stroke will be more practical, but the frequency of pipe connections will increase accordingly.
Formations and processes: staged use of mud rotary drilling and DTH hammer
The common formation combination in medium-deep water supply wells is an upper loose overburden layer and a lower weathered rock to intact hard rock. The approach given in the WRT600 data is: soil, clay, sand, and gravel layers can be drilled with mud rotary drilling using a mud pump, with mud carrying cuttings and helping stabilize the borehole wall; after entering more intact rock formations, a DTH hammer can be switched to, with a recommended working air pressure of 1.2–3.5 MPa and air consumption of 16–55 m³/min. Mixed formations are suitable for switching processes by hole section rather than using a single method throughout the entire hole.

Air supply support must be checked separately: air compressor selection must consider hole diameter, hole depth, DTH hammer specifications, rock hardness, and altitude at the same time. If only pressure is achieved but displacement is insufficient, it will still cause insufficient impact and difficult cuttings removal. This part belongs to the supporting conditions of the overall machine solution, and the equipment data itself cannot replace on-site air supply calculations.
Which projects are worth prioritizing, and which still need verification
According to the data description, the applicable scenarios of the WRT600 include agricultural irrigation, municipal water supply, industrial water wells, mining water supply, engineering dewatering, and geothermal investigation. Combined with the characteristics of the truck-mounted straight mast, the following types of projects are more worth including in the comparison:
- Water supply projects with hole locations scattered across multiple sites, short single-well durations, and high relocation frequency;
- Completion operations with target well depths in the medium-deep range that require handling longer drill strings and some casing;
- Wells where upper loose layers alternate with lower hard rock and require staged switching between mud rotary drilling and DTH processes;
- Areas that are arid or lack a stable mud water source but have rock formations suitable for pneumatic drilling.
The matters requiring advance confirmation are equally clear: road and site load-bearing conditions corresponding to the 26 T overall weight, height limits and clearance in the straight mast transport state, actual matching of air compressor displacement and pressure, completion design of well casing, screen pipes, and submersible pumps, and hydrogeological data for the project location. If these conditions are not settled, looking only at drilling depth and torque figures cannot determine whether the equipment is suitable.
What the truck-mounted straight mast brings is a reduction in relocation steps and simplification of the mast operation method, while the cost falls on advance verification of road clearance and site load-bearing capacity. When selecting equipment, presenting both sides is closer to project reality than comparing only a single drilling depth figure.