When an underground coring plan remains undecided, the common cause is not a missing machine but reading the data in the wrong order. One may first be drawn to the 800 m or 900 m figures, then look at roadway width and cage dimensions, only to find that transport was never accounted for; or one may first check spindle speed without matching the hole direction to the corresponding drill depth table. Based on public information for an underground electric fully hydraulic core drill, this article gives a reading order that starts from site constraints and gradually narrows down to equipment conditions, and explains which items must be separately verified before purchase.
Step 1: Read roadway and transport conditions first, not drill depth
The biggest difference between an underground drill site and a surface site is getting in. Equipment must reach the working point in batches via inclined shafts, cages, mine cars, or roadway transport systems, and roadway width, height, turning radius, and lifting capacity form the first screening conditions. The data show that the machine uses a modular split structure: the power station, feed mechanism, drill base frame, oil tank, and control unit can be transported separately and then assembled at the drill site.
The data list reference weights for the main modules: power station 240/270 kg, main feed mechanism 130 kg, drill base frame 120 kg, oil tank unit 120 kg, and control unit 90 kg. These values are first used to check cage rated load, roadway gradient, and track conditions, not to judge drilling capability. The data also note that the control unit weight is given as 130 kg in the parameter table and 90 kg in the module summary; where two different figures appear, the official technical confirmation document should govern the actual transport plan.
The point of this order is that if the existing transport route cannot handle any one module, all later discussion of drilling parameters has no basis for implementation. Conversely, modular disassembly only addresses whether the equipment can get in; it does not automatically resolve whether it can be positioned once inside. Separate confirmation is still required for drill site roof, rib, and floor support as well as base frame anchoring.
Step 2: Check reference drill depth by hole direction, without taking values across rows
Underground core holes include downward, horizontal, and upward types, and the same machine does not have the same reference capability in different directions. The corresponding relationships given in the data are as follows:

| Hole direction | BQ reference drill depth | NQ reference drill depth | HQ reference drill depth |
|---|---|---|---|
| 90° | 920 m | 800 m | 380 m |
| 0° (horizontal) | 600 m | 400 m | 200 m |
| -90° (upward) | 350 m | 200 m | 150 m |
When reading this table, first determine the direction and specification of the designed hole at the mine, then take the corresponding cell; do not treat the maximum value for one direction as a general capability for other directions. The data also note that different mines may define the positive and negative signs of angles differently, so the site installation direction and design drawings should govern before construction. The values in the table are markings under reference conditions; the actual achievable hole depth is affected by formation, in-hole tools, drilling angle, and operating method, and the data themselves note that final drilling results depend on site conditions.
The resulting judgment is conditional: if the design uses horizontal holes to control the orebody, first check whether the BQ, NQ, and HQ values in the 0° row cover the hole depth; if the task also includes upward holes, the -90° row must be included separately in the comparison rather than replaced by the 90° row.
Step 3: Connect feed, clamping, and wireline capabilities to in-hole operations
The drill depth table only answers how deep the machine can drill; whether in-hole operations run smoothly also depends on other data sets. The data directly relevant to coring operations include:
- The feed mechanism is driven by a hydraulic cylinder, with a stroke of 1800 mm, thrust of 65 kN, pull force of 130 kN, and fast travel speed of 0.9 m/s. The drill string is stressed differently in horizontal, downward, and upward holes, so feed and pullback parameters need to be adjusted according to hole depth and changing friction.
- The power head is a hydraulic top drive with a speed of 0–1500 rpm, torque of 600–1480 N·m, and a 107 variable motor. The data explain that the wide speed range facilitates selection of working conditions according to BQ, NQ, and HQ specifications and rock hardness.
- The drill rod clamp has a maximum applicable drill rod size of 108 mm, a through-hole of 128 mm, and a clamping force of 80 kN. Underground drill sites have limited space, and make-up/break-out and collar operations are concentrated, so clamping stability directly affects drill rod handling. The data note that clamp block wear and hydraulic pressure should be checked regularly.
- The wireline winch has a rope capacity of 800 m and uses 6 mm wire rope; minimum lifting force at full drum is 800 N, maximum lifting force at empty drum is 1800 N, and lifting speed is 1.8–4.8 m/s. Wireline coring can reduce repeated tripping of the entire drill string and helps lower auxiliary time in underground medium-deep hole construction.
These data should be viewed together: the 800 m wireline capacity corresponds numerically to the 800 m reference drill depth for NQ in the 90° direction, but that does not mean it can be fully used in any formation or any direction; actual hole depth in upward and horizontal holes is also constrained by drill string friction and cuttings removal conditions. The selection of feed force, lifting force, and rotation speed must likewise serve BQ, NQ, and HQ tool combinations rather than pursuing a single peak value in isolation.

Step 4: Power supply, cooling, and explosion protection conditions must be clarified before purchase
The machine uses electric motor power. The data give two motor configurations, 22 kW × 3 or 30 kW × 2, with main system flow of 200 L/min and pressure of 210 bar, and auxiliary pump flow of 10 L/min and maximum pressure of 150 bar. An electric motor solution produces no combustion exhaust in enclosed or semi-enclosed underground drill sites, but the premise is that stable power supply is already available on site. The data explicitly require that the electrical scheme be confirmed according to mine voltage, frequency, cable length, and starting method during actual configuration.
The hydraulic oil tank capacity is 100 L and uses water cooling. Underground air flow is limited, so water cooling helps control oil temperature, but cooling water supply and heat exchanger flow must be ensured; where water quality is poor, the heat exchanger should be cleaned regularly to avoid scaling that affects heat dissipation. Hydraulic system oil cleanliness, high-pressure hoses, fittings, and filtration status also need to be included in routine inspection.
The data specifically note that standard motor configurations cannot be directly regarded as explosion-proof configurations. In coal mines, gassy mines, or underground environments with combustible dust, motors, control boxes, cables, and protection systems with the appropriate explosion-proof rating should be selected according to local mine safety regulations, and the equipment must not be used directly in areas with explosion-proof requirements without confirmation. This is a precondition for the plan to be valid, not a detail that can be added later.
Step 5: Handling of broken formations and special hole sections must be written into the plan
The data mention that when fault gouge, breccia, or strongly broken zones are encountered, the run length should be shortened, penetration reduced, and changes in return water observed; if necessary, casing, adjustment of flushing fluid, or staged treatment should be used. In such formations, the focus is on maintaining borehole wall stability and improving effective core recovery, not simply pursuing footage. The equipment can be optionally equipped with a 120 series high-pressure plunger pump, with maximum flow of 120 L/min and maximum pressure of 70 bar, for flushing and some special circulation conditions; whether to select it depends on the purpose of the hole and the circulation method, and the data do not provide a conclusion on the pump's applicability under all conditions.

For water-bearing faults and advanced geological drilling, the data explain that core, return water, and pump pressure changes can assist in judging fracture development and water-bearing structures, but this is an on-site comprehensive judgment and safety conclusions cannot be drawn from equipment configuration alone. During underground installation, it is also necessary to check drill site support, anchor the base frame, route cables and hoses away from transport routes, and take appropriate precautions for drill rods, core barrels, and high-pressure fluids in upward and horizontal holes.
After reading in this order, what else should be confirmed with the supplier
The data can answer questions at the structural and parameter level but cannot replace project-level confirmation. After reading in the above order, formal technical documents should still be requested for the following items:
- Electrical configuration corresponding to mine power supply parameters and starting method, and whether explosion-proof requirements apply;
- Cooling water source, water quality, and heat exchanger cleaning conditions;
- The specific corresponding conditions for the designed hole direction, specification, and reference drill depth table;
- Compatibility of actual module weights with cages and roadway transport, and which document governs the two different markings of control unit weight;
- Matching of drill rod specifications and wireline winch with the selected coring process, and whether the high-pressure plunger pump needs to be selected;
- Treatment plans and supporting drilling tools for special hole sections such as broken zones and water-bearing structures.
When requesting a quotation, providing the drilling purpose, designed hole depth and diameter specification, hole direction, formation description, roadway transport conditions, and power and water supply conditions makes it easier to obtain a verifiable configuration plan than asking only about a model. Drilling efficiency, core recovery, and construction cycle, which are not given in the data, should not be firmly promised at the planning stage.