When planning deep follow-up holes in a mining area, someone often asks first: “This rig can drill 800 m, so let's lay out holes to 800 m.” This reasoning skips two steps: which core size the drilling depth corresponds to, and whether that depth holds in the target formation. Treating the nominal value directly as the controllable orebody depth often leads to discovering only after the hole is more than half done that hoisting, rope capacity, or circulation conditions cannot keep up.
Below, using data for an 800 m class fully hydraulic integrated core drill as an example, we explain how to read the drilling depth figure and which conditions to consider together. All values in this article come from public information for this model and are reference values under specific specifications, not guaranteed values.
Why the same rig has three drilling depth figures
The reference drilling depths given for this model are: NTW about 800 m, HTW about 500 m, and BTW about 1000 m. These three figures do not correspond to three rigs but to three core sizes. Different hole diameters and core diameters mean different drill string loads per unit length, annular resistance, and core capacity, so the reference depth for the same machine is not consistent across specifications.

| Core size | Reference drilling depth | What it means on site |
|---|---|---|
| HTW | About 500 m | Larger core size, relatively tighter depth limit |
| NTW | About 800 m | Medium size, the positioning reference depth for this model |
| BTW | About 1000 m | Smaller core size, higher reference depth |
In other words, if the project requires larger-diameter core or more casing in the hole, directly applying 800 m is not rigorous. Before laying out holes, first determine the core size required for orebody sampling, then check whether the reference drilling depth for that size covers the design hole depth.
Formations do not yield to nominal equipment ratings
The model's torque is about 300–800 N·m in high-speed gear and about 300–1000 N·m in torque gear, rotation speed 0–1500 rpm, feed force 63 kN, and hoisting force 152 kN. These capabilities perform differently in intact hard rock and in broken zones: fault gouge, breccia, and strongly weathered sections amplify borehole wall friction and sticking risk, and the drill string weight in deep hole sections is not comparable to that in shallow holes.

Therefore, “how deep it can drill” must be broken down into at least three questions: whether the drill string can rotate stably in the target lithology, whether the hoisting system can pull the drill string out from the bottom, and whether the circulation system can continuously carry cuttings out. The nominal drilling depth only answers the project positioning question, not these three questions.
As depth increases, which margins are consumed first
- Wire rope capacity: The winch uses 6 mm wire rope, with a rope capacity of 1000 m, hoisting force 13 kN, and hoisting speed 120 m/min. Wireline coring relies on the inner tube to retrieve the core; the deeper the hole, the greater the length of wire rope in the hole and the higher the inspection requirements for wear.
- Hoisting capacity: The 152 kN hoisting force is used for tripping out and handling some downhole resistance, but the documentation also cautions against relying solely on increasing hoisting force to forcibly free stuck tools; judgment should combine downhole resistance, mud circulation, and formation changes.
- Mud circulation: The hydraulic mud pump has a reference flow of 100 L/min and pressure of 70 bar. In sections with developed fractures and obvious loss, actual returns and pump pressure will deviate from design values, and deep hole sections demand higher circulation stability.
- Drilling angle: The rig supports drilling angles of 45°–90°. Inclined holes help intersect dipping orebodies, but drill string friction and deviation control in inclined holes are usually more difficult than in vertical holes, so more conservative allowance should be left when designing hole depth.
Judging whether this model is worth considering
If the project is medium-depth mineral exploration for gold, copper, lithium, etc., surface surveys or shallow-hole reconnaissance have been completed, continuous core is needed for orebody tracing, infill control, or resource verification, and hole locations are scattered requiring repeated short-distance moves on a crawler chassis, then the structure and positioning of this integrated rig match: crawler travel speed about 2.5 km/h, reference climbing angle 30°, overall transport dimensions about 5000×1800×2550 mm, weight about 5800 kg, ground-contact integrated mast, feed stroke 2500 mm, power 132 hp (97 kW)/2200 rpm, with domestic engine optional.

Conversely, if the project's main purpose is rapid cuttings removal, or the design hole depth clearly exceeds the reference value for the core size used, this model should not be taken as an automatic option. In that case, consider reducing core size, staged construction, or other drilling methods rather than inflating the drilling depth figure on paper.
Items to verify with the supplier before purchase
- Confirm the reference drilling depth according to the project's actual core size (HTW/NTW/BTW), and require written confirmation of the specification and conditions corresponding to that value.
- The target mining area's lithological assemblage, location of broken zones and aquifers, and whether loss zones will occur.
- Design hole depth, hole diameter, drilling angle, and whether casing will be installed; the impact of the casing program on hoisting and circulation.
- Whether the interface specifications of drill rods, bits, wireline, and overshot tools match the main unit.
- Engine power correction and cooling conditions at high-altitude or high-temperature sites; the air-cooled plus water-cooled combination in the equipment documentation requires on-site verification of radiator cleanliness and ventilation layout.
- Access roads, platform dimensions, ground bearing capacity, and slope conditions; the 5800 kg overall weight and crawler chassis have specific requirements for access road width and turning radius.
- Daily maintenance items such as hydraulic oil cleanliness, filter replacement, and wire rope inspection should be carried out according to the accompanying technical documents, and cycles from other models should not be applied.
When requesting a quotation, provide the drilling purpose, stratigraphic column data, target hole depth and diameter, core size, drilling angle, access and transport conditions, and sources of water, power, and mud materials, so that the supplier can give a substantiated configuration recommendation. The correct use of nominal drilling depth is as a starting point for selection, not as a conclusion about orebody control depth.