One of the most common deviations in irrigation water supply projects is treating 'how deep to drill' directly as 'how large a rig to buy.' In actual construction organization, a mid-deep well must simultaneously satisfy completion diameter, formation penetration, casing and well development, continuous operation, and site access conditions. Matching only the drilling depth figure may still leave the rig stuck during tripping, wall protection, or air supply after it arrives on site. Starting from the operating goals of irrigation and mining area water supply, this article breaks down a set of mid-deep well equipment conditions item by item, then compares them with data for a 400-meter-class crawler fully hydraulic water well drilling rig to explain which capability items relate to these conditions and which still need separate verification before purchase.
Clarify the water supply goal first, then discuss equipment
Farmland irrigation, rural water supply, and mining area water supply do not have identical well requirements. Irrigation wells are more concerned with whether the yield can support water use intensity during the irrigation season, and the well diameter must leave space for pump pipes and filter media; mining area water supply must also consider camp living, dust suppression, and production auxiliary water, and well locations may be scattered near crushed stone sites or hillsides. Before equipment selection, at least four things must be clarified: target depth per well, opening and completion diameters, the expected formation combination to be penetrated, and the transfer distance between well locations.
Without these items settled, discussing drilling depth, torque, or lifting force lacks a reference. For example, the same nominal 400-meter class can differ greatly in drilling tools, circulation method, and auxiliary time when drilled in intact hard rock versus loose sand layers; for the same well, whether casing is run and how filter pipes are arranged will in turn affect the lifting force and hole diameter range the equipment must provide.
Break down goals into equipment capability items
Well depth: leave margin, but do not treat the upper limit as a promise
The maximum drilling depth of 400 m given in the data is a nominal value within the equipment capability range. It is suitable for judging whether the equipment class covers the project depth, but it should not be understood as being able to steadily drill to 400 m in any formation and at any diameter. Actual well depth must still be determined in combination with local hydrogeological conditions, target aquifer depth, and completion technology. If most wells in the project are around 200 meters and only individual locations are deeper, it is necessary to distinguish what configurations correspond to routine depth and upper-limit depth respectively.

Diameter: 105–325 mm covers a range from opening to completion
A drilling diameter of 105–325 mm means the equipment can cover the interval from small-diameter exploration-type water wells to larger-diameter completion. Irrigation wells and centralized water supply wells often require larger completion diameters to place pump pipes and filter media; the specific level to choose depends on design well diameter, whether casing is run, and formation stability. After the hole diameter is enlarged, rotary load, cuttings discharge volume, and wall protection requirements all change, and construction cannot be organized only according to experience with the minimum diameter.
Formation: one rig must face alternation between soil and rock
The data shows that this model can use DTH hammer drilling and also supports mud rotary drilling. Loose formations such as soil, clay, and sand layers are more suitable for mud circulation, which is used for wall protection, carrying drill cuttings, and maintaining hole diameter; after entering weathered rock, limestone, sandstone, or granite, the DTH hammer and bit can be selected according to hardness and diameter. Projects with thick upper overburden and hard rock below often require switching processes within the same well, which tests supporting organization more than a single formation.
Drill pipe and lifting force: continuity conditions for tripping in mid-deep holes
This model directly supports 6 m drill pipes, recommended drill pipe diameters of 89 / 102 mm, and a lifting force of 22 T. The value of 6-meter drill pipes lies in reducing the number of pipe connections, which has a practical impact on auxiliary time for 300–400-meter-class wells; lifting force relates to drill pipe dead weight, borehole wall friction, and casing handling as hole depth increases. It should be clear that lifting force is mainly used for normal tripping and recovery of drilling tools; when sticking, hole shrinkage, or block falling occurs, the priority should still be handling through hole cleaning and process adjustment, and the maximum lifting force cannot be treated as a means to solve downhole abnormalities.

Rotation: dual working conditions correspond to different diameters and rock stages
The rotary system has a maximum torque of 8000 / 4000 N·m, corresponding to maximum speeds of 75 / 150 r/min. Low speed and high torque are more suitable for large diameter, hard rock, and high-load stages, while higher speed is suitable for drilling stages with relatively lower resistance. On site, working conditions should be selected according to changes in hole diameter, drilling tools, and rock formation; fixing a single speed for a long time is not appropriate. In selection, the question should be: which interval do the project's main diameter sections and rock sections fall into, rather than only comparing maximum torque.
Air supply: DTH hammer drilling must be considered together with the air compressor
When DTH hammer drilling is used, the recommended working pressure is 1.2–3.5 MPa, air consumption is 16–55 m³/min, and it can match medium- and high-pressure series DTH hammers. For larger diameters, intact hard rock, or high-altitude conditions, whether the air compressor displacement is sufficient is often more important than merely reaching a pressure value. The equipment itself does not include air compressor capability; air supply supporting equipment must be calculated separately for the project, and this is an item that must be confirmed before purchase.
Site and transfer: the crawler chassis solves part, not all
The overall weight is about 8.6 T, dimensions are about 6.25 × 1.7 × 2.39 m, crawler travel speed is about 3 km/h, and the maximum climbing angle reference is 21°. Hydraulic outriggers have a stroke of 1.6 m and can be used for leveling and stable support. For irrigation projects with scattered well locations, the crawler chassis can reduce repositioning preparation within the site; however, an 8.6 T machine still requires caution on soft soil, wet slippery ground, and side slopes. Mats should be used on soft ground to ensure even outrigger loading. Cross-region transfer requires a suitable flatbed trailer, fixing points, and loading ramps, and accessories such as 6-meter drill pipes should be secured separately.

For power, a 103 kW diesel engine provides power for rotation, feed, travel, outriggers, and auxiliary systems, with relatively low dependence on fixed power supply, making it suitable for field water well projects. However, mid-deep hole and hard rock construction last a long time, so cleaning of the air filter and radiator, cooling, and fuel quality should all be implemented in daily organization.
Supporting equipment and boundaries: what must be decided together, what cannot be omitted
- Air compressor: when DTH hammer drilling is used, match according to the pressure and air consumption range, and leave margin in displacement; specific selection must be confirmed in combination with hole diameter, rock formation, and altitude.
- Mud system: the data lists optional mud pumps, centrifugal pumps, generators, and foam pumps. Loose-layer projects rely more on mud and drainage, and formations with severe air loss may require foam assistance.
- Well completion: filter pipes, water-stop sections, casing, and well development plans should be determined before spudding, and cannot be added only after drilling is completed.
- Auxiliary winch: the 1.5 T small winch can be used for handling DTH hammers, drill pipes, and accessories. Loads should be controlled during lifting, and personnel should not stand under suspended objects.
- Inapplicable boundary: if the project requires high-quality core samples, a dedicated core drilling rig should be used, and a water well drilling rig cannot be used as coring equipment.
Items to confirm before purchase
By comparison, the 400-meter-class crawler fully hydraulic water well drilling rig corresponds to multiple conditions of mid-deep irrigation wells and mining area water supply in terms of depth coverage, 6-meter drill pipes, 22 T lifting force, dual-condition rotation, and dual-use mud/DTH hammer processes. However, this is only a judgment of condition matching and cannot replace site demonstration. Before inquiry, it is recommended to prepare: drilling purpose and water supply scale, target well depth and completion diameter, expected formation column and aquifer depth, planned drilling method and wall protection method, transfer distance and road conditions between well locations, on-site power and air supply conditions, and whether mud pumps, generators, and other options are needed. Only after these conditions are complete and equipment parameters and supporting lists are checked can 'can cover' become an executable construction organization.