ShanBo
Location:Home>News Center

-News Center-

Matching Sampling Workflow to Hole Depth in Reverse Circulation Exploration

Date:2026-11-09 14:48:55Views:19

After reverse circulation exploration holes reach mid-to-deep sections, a common misalignment occurs on site: the rig keeps advancing, but sample return begins to slow and become intermittent, depth markings on sample bags grow denser, and the sampling workflow falls behind the drilling rhythm. To decide whether a 600 m class tracked RC rig is suitable, the first question is not "how deep can it drill" but "with this sampling interval and sample volume, can the sampling workflow continuously keep up with drilling."

Determine sampling objectives first, then discuss hole depth

Reverse circulation drilling produces cuttings samples, not complete cores. Mineral exploration projects typically collect samples at fixed intervals, for example one bag every 1 m or every 2 m, while recording hole number, start and end depths, and sample number. Once this interval is set, two things can be derived: the number of sample bags per hole and the hourly throughput of the sample return system. As hole depth increases, accumulated samples grow, and the pressure of manual sample handling and secondary transfer becomes more pronounced.

If the project objective is to rapidly screen anomalies using cuttings and then arrange core verification for key sections, the continuity of the sampling workflow deserves higher priority than the maximum depth of a single hole. If the objective itself is continuous coring or fine-scale stratigraphic judgment, the information content of RC cuttings samples is insufficient to replace coring; this is a fork in the process route, not something equipment capability can compensate for.

As hole depth increases, sample return conditions change first

As hole depth increases, cuttings must travel through a longer inner tube of dual-wall drill pipe to return to the surface, and the effects of air volume loss, drill pipe sealing, and in-hole air leakage on sample recovery gradually amplify. Equipment documentation gives a recommended working air pressure of 1.6–6 MPa and air consumption of 16–75 m³/min; this range is not only for driving the RC hammer but also must ensure cuttings can continuously return through the inner tube to the cyclone sampling system. When air compressor displacement is insufficient, common on-site symptoms are reduced sample return, delayed sample return, and cuttings accumulation at the hole bottom, and the correspondence between samples and depth also deteriorates.

Matching Sampling Workflow to Hole Depth in Reverse Circulation Exploration

Therefore, hole depth and air supply capacity must be considered together. 600 m is the maximum drilling depth stated in the equipment documentation; the actually achievable depth will vary with hole diameter, dual-wall drill pipe weight, air compressor capacity, and formation conditions. Treating 600 m as actual capability in any formation and any hole diameter is a common misreading.

Use a decision path to check three sets of conditions

To judge whether the sampling workflow can match the hole depth, proceed in the following order:

  • First set: sampling interval and sample volume. Whether the number of sample bags per hole, splitting frequency, and bagging and numbering manpower match the planned footage. For projects with large daily sample volumes, the fewer manual sample handling steps, the better.
  • Second set: hole depth, hole diameter, and drilling tools. Documentation states a drilling diameter of 105–450 mm; the larger the hole diameter, the higher the required air volume and sample return capacity; the sealing condition of dual-wall drill pipe directly affects whether inner-tube sample return is stable.
  • Third set: air supply and formation. In competent rock, an RC hammer or DTH hammer can be used for drilling; loose overburden, fault fracture zones, and large fissures may cause hole collapse or air leakage, and cuttings may be retained and then return in bursts, distorting the correspondence between samples and actual depth. For such hole sections, reduce advance rate, maintain hole cleaning, and separately record anomalous intervals.

If any one of the three sets of conditions does not hold, drilling progress and the sampling workflow will fall out of sync; at that point, adjust the process or supporting equipment first rather than continuing to increase advance.

What the three-in-one cyclone sampling system connects

The equipment integrates a three-in-one cyclone sampling system that links cyclone separation, representative splitting, and sample collection into one continuous process: after cuttings return to the surface through the inner tube of dual-wall drill pipe, they enter the cyclone system for gas-solid separation, then proceed to splitting and bagging. For exploration projects requiring continuous drilling, continuous sample return, and management of large numbers of sample numbers, this arrangement reduces manual sample handling and secondary transfer steps, making the connection among drilling, sample return, splitting, and bagging tighter.

Matching Sampling Workflow to Hole Depth in Reverse Circulation Exploration

However, a smooth process does not mean sample representativeness is automatically established. If residual cuttings from the previous section remain in the cyclone, splitter, or sample return hose, the risk of sample contamination increases. Each time drilling stops, the hole is changed, or a new key sampling interval is entered, these parts should be checked and cleaned. Sample bags should be marked with hole number, sample number, start and end depths, date, and shift, and site records should be consistent with sample bags; projects implementing QA/QC systems should also set duplicate samples, standard samples, and blank samples as required.

Equipment conditions and work organization must be arranged together

This model has an overall weight of approximately 12.5 T, dimensions of approximately 7 × 2.1 × 2.9 m, a tracked travel speed of approximately 3.5 km/h, and a maximum climbing angle reference of 21°. In addition to the rig, the site must also accommodate an air compressor, cyclone sampling system, sample bags, and transport vehicles; the drilling platform should reserve sufficient area to ensure smooth sample return piping and safe personnel access. Leg stroke is 1.7 m, which can be used for leveling and stable support; for 45° inclined holes or high-torque drilling, the overall force direction is more complex, and platform stability directly affects hole direction control.

For power, the equipment uses a 132 kW engine to provide power for rotation, feed, tracked travel, and auxiliary hydraulic systems. RC sites usually also require a large air compressor and sampling system; fuel supply, equipment layout, and maintenance space should be planned uniformly before start-up. Maximum rotation torque is 12000 / 6000 N·m, corresponding to rotation speeds of 75 / 150 r/min; on site, adjust dynamically according to sample return status and drilling tool load rather than drilling the entire hole at a fixed gear.

Matching Sampling Workflow to Hole Depth in Reverse Circulation Exploration

Application boundaries and items still requiring confirmation

The equipment documentation positions this machine for both mineral exploration and deep water well construction. When used for water well projects, the focus shifts to hole wall stability, aquifers, and well completion structure, and it may not be necessary to activate the full sampling system; drilling tools and construction procedures can be changed according to use. However, water well completion structure, aquifer judgment, and dewatering design are outside the scope of rig capability and need to be determined by corresponding professional documentation.

The following items still need to be confirmed one by one before purchase or start-up: actual air supply matching under the target hole depth and hole diameter combination; distribution of fracture zones and air leakage sections in the formation; air compressor displacement and altitude conditions; whether dual-wall drill pipe connections are compatible with existing drilling tools; sample management system and manpower allocation; transport road load capacity and platform area. These conditions vary, and the actual performance of the same machine will differ; nominal values in documentation cannot replace on-site verification.

Information to provide when requesting a quote

Regarding the matching of sampling workflow and hole depth, it is recommended to provide the following when requesting a quote: drilling purpose (mineral exploration, water well, or groundwater investigation), expected hole depth and hole diameter, sampling interval and sample volume per hole, formation description (including overburden and fracture zones), planned drilling method and drilling tools, air compressor supply conditions, access road and platform dimensions, and water, power, and fuel supply conditions. The more complete the information, the easier it is to judge whether the sampling workflow and drilling arrangement connect, rather than comparing only a single drilling depth number.