In slope anchoring work, drilling rigs often fail not because they cannot drill, but because they cannot safely reach position, stay stable, or reach the hole locations. Anchor bolt holes, anchor cable holes, and drainage holes are arranged in different directions along the slope, and working platforms are usually formed by excavation or backfilling, with limited area. If platform bearing capacity, slope stability, transport access, and hole-direction coverage are not clearly checked before the equipment enters the site, the later costs of repositioning the machine, adding mats, or changing hole locations will increase noticeably. The following sections explain what should be confirmed item by item before positioning, in the order of site conditions, based on public information for a 30 m-class crawler hydraulic DTH drill.
First confirm whether the platform itself can support the equipment
The information gives an overall machine weight of about 2500 kg and dimensions of about 3200×1200×1850 mm. This size is compact for an engineering drill rig, but temporary platforms built on slopes still have requirements. Before positioning, confirm whether the platform has sufficient bearing area, whether there are loose backfilled areas at the edges, and whether there are voids or buried lines beneath the crawler contact points. The equipment uses an engineering rubber crawler chassis, which provides better traction than wheeled structures on crushed stone, compacted soil, and generally uneven ground, but the advantage of crawlers does not replace judgment about platform bearing capacity, and safe distances should still be kept from edge areas.
Platform width should also be considered together with the machine body width of about 1.2 m and the space required for swing movements. The equipment has an 18–180° swing angle, and during posture adjustment the mast and drilling tools extend beyond the machine's static outline, so the platform cannot be reserved only according to the machine body width.

Rockfall on the slope and support status determine whether drilling can start
The information explicitly states that before slope construction, platform stability, rockfall risk, and support conditions should be checked to avoid operating equipment directly on unstable slopes. This should be placed before hole layout: whether there are loose rock blocks on the upper slope, whether completed anchoring sections meet design requirements, and whether reliable interception, drainage, or protection exists behind the platform all affect whether the equipment can remain on the platform for an extended period. DTH drilling involves high-pressure exhaust and rock dust dispersion, and personnel must not enter the areas of the rotating drill rod, high-pressure exhaust, and mast movement; the working boundaries on the platform should also be defined accordingly.
Transport access and turning space should be checked against actual machine dimensions
The machine body is about 1.2 m wide and about 3.2 m long. During transport, a vehicle with matching load capacity and securing points is still required, and the loading and unloading ramp must have sufficient bearing capacity and prevent the crawler from slipping sideways when driving on and off. Before entering the construction access road, confirm the turning radius, road compaction, and overhead obstacles along the route. The equipment travel speed is 5–10 km/h, which is suitable for short-distance transfers within the site but does not mean it can relocate itself over long distances. If the platform can only be reached via a narrow access road, it is necessary to determine in advance whether the transport vehicle can get close and whether there is room to maneuver at the unloading point.
Hole-direction coverage and design hole locations should be checked hole by hole
Slope anchoring holes include anchor bolt holes, anchor cable holes, and drainage holes, and their directions often change with the slope. The information shows that the equipment has a tilt adjustment function and a swing angle range of 18–180°, and can be used for vertical holes, inclined holes, and some side holes. However, the original information does not give a clear numerical range for tilt adjustment, so it cannot be assumed that any design angle can be covered merely because it “has tilt adjustment.” Before positioning, check each design hole location: whether the swing angle can reach the hole collar from the current position, whether the adjusted mast interferes with the slope or completed structures, and whether adjacent hole locations require frequent machine repositioning. The slide frame stroke is 3.2 m and the effective stroke is 2.2 m, corresponding to the construction rhythm of medium-short drill rods and short piles; when hole locations are dense, the number of machine moves should also be included in the plan.

Air supply, dust control, and matching drilling tools must be arranged at the same time
DTH drilling relies on compressed air to drive the DTH hammer and discharge cuttings. The reference air consumption in the information is about 8 m³/min, with a note that the original table marked it as 8 m²/min; this article interprets it according to the common compressed air flow unit, and the final value should be confirmed in formal technical documentation. Before positioning, confirm whether the air compressor capacity and piping layout can reach the platform, and whether the route of the high-pressure air hose on the slope will be run over or pulled. Dust is obvious when drilling dry hard rock, and a dust collector or water mist suppression system can be configured according to the project. The specifications of the DTH hammer, bit, and drill rod should be selected according to rock hardness and hole diameter. The information states that the applicable rock hardness is about f=8–24; under hard rock conditions, compressed air supply and DTH hammer lubrication must especially be ensured.
Formation changes and hole protection conditions should also be considered in advance
The upper part of slopes often contains weathered rock, soil-rock mixed layers, and loose overburden, which can easily cause unstable hole walls; fissures and broken zones may cause block falling, air leakage, and stuck drilling. The information recommends reducing the feed speed in such formations and using casing, starting tools, or other upper-hole stabilization methods as needed. Before positioning, confirm whether materials such as casing and starting tools have been transported to the platform to avoid temporary allocation after drilling starts.

Checklist before positioning
| Check item | What to confirm | Basis in the information or to be confirmed |
|---|---|---|
| Platform bearing capacity | Bearing area, edge backfill zones, buried pipelines | Overall machine about 2500 kg, crawler chassis |
| Slope safety | Rockfall risk, support status, interception and drainage | Information advises checking platform stability and rockfall risk first |
| Transport access | Access road width, turning space, unloading point | Dimensions about 3200×1200×1850 mm |
| Hole-direction coverage | Design angle, swing interference, number of machine moves | Swing angle 18–180°, tilt adjustment range not given |
| Air supply provisions | Air compressor capacity, piping route, air hose protection | Reference air consumption about 8 m³/min, unit to be confirmed in formal documentation |
| Drilling tools and hole protection | DTH hammer, bit, drill rod, casing | Applicable hardness about f=8–24, loose layers require hole stabilization measures |
Which conditions still need to be confirmed with the supplier
The information does not give the specific angle range for tilt adjustment, nor does it specify the required air compressor pressure level for different hole diameters. If the project design hole direction exceeds the conventional inclined hole range, or the rock hardness is close to the upper limit of the applicable range, the design hole direction, hole diameter, hole depth, rock type, and integrity should be provided during inquiry so the supplier can confirm the swing angle configuration and air supply matching. Regarding transport, the maximum drilling depth of 30 m is a nominal capability; the actual drillable depth is still affected by rock formation, hole diameter, and drilling tool combination, and 30 m cannot be directly treated as the completed hole depth in any formation.
When making an inquiry, state together: the purpose of drilling (anchor bolt holes, anchor cable holes, drainage holes, or foundation pre-drilling), formation information, target hole depth and diameter, design hole direction, platform dimensions and bearing conditions, transport access road conditions, air compressor and water/power conditions, and whether dust collection or water mist suppression is required. Put these questions on paper first, then judge whether the equipment matches the site conditions.