When laying out holes for mineral exploration, the drill hole inclination is not something you settle by choosing equipment first and adjusting later. When an orebody occurs as an inclined vein or is controlled by a structural zone, a near-vertical hole often passes through only a short segment of the mineralized body, or even runs along the mineralized zone. To make a hole cross the mineralized zone at a reasonable angle, you must first determine the inclined-hole angle based on orebody attitude and the exploration line direction, then judge whether the rig's drilling angle range, depth class and coring specification can handle the task together.
This article addresses one specific question: in medium-depth mineral exploration, when hole positions require inclined holes laid out according to orebody attitude, what conditions must a tracked integrated full-hydraulic core rig meet, what information helps the judgment, and what must be verified on site.
Define the angle requirement first, then see whether the rig can be set to that angle
For exploration holes in inclined orebodies, the drilling direction should generally form as large an intersection angle as possible with the strike or dip of the mineralized zone. In quartz-vein-type gold deposits, shear-zone-type gold deposits and structurally altered deposits, orebodies commonly show inclined extension and local pinch-out and reappearance. If the hole angle does not match orebody attitude, judgment of the mineralized thickness intersected by core and of continuity will be affected. Therefore, at the hole layout stage, the target angle range should be confirmed first, then compared with the rig's drilling angle range.
Information on the related product shows that this model's drilling angle is 45°–90°, with a ground-contact integrated mast structure. This means that when the medium-depth inclined-hole requirement falls within this range, the rig has the basic conditions for angle adjustment; angle requirements outside this range cannot be solved by this machine. The angle range is the first threshold in selection—do not look at drilling depth first and angle second.
Classify by target hole depth and coring specification, not by model numbers alone
After the angle is confirmed, the second judgment concerns hole depth and coring specification. This model is positioned at a reference drilling depth of 800 m for NTW, with reference depths of 500 m for HTW and 1000 m for BTW. The three specifications correspond to different target hole diameters and core sizes. The reference depth for one specification cannot be directly applied to all hole diameters, nor should the nominal drilling depth be understood as the actual completed hole depth under any formation conditions.

| Coring specification | Reference drilling depth | Points to watch during selection |
|---|---|---|
| HTW | 500 m | When target hole diameter is larger and core size requirements are higher |
| NTW | 800 m | Medium-depth orebody tracing and control |
| BTW | 1000 m | Small-diameter deep holes where depth is the priority |
The way to use this table is to determine the coring specification first, then compare it with the target hole depth. If the project requires larger-diameter core for logging and assay, the HTW reference depth is closer to the starting point for judgment; if the main goal is control of deep orebody extension and core size can be appropriately reduced, the BTW class comes into consideration. How deep the rig can actually drill also depends on formation integrity, downhole friction, mud circulation and drill string configuration.
What the integrated structure means under inclined-hole conditions
This model uses crawler travel and a full-hydraulic integrated layout, with power, hydraulics, mast, power head, winch and mud circulation concentrated on the same platform. For projects with scattered hole positions and repeated short-distance moves within the mining area, the integrated structure reduces on-site module assembly. When changing holes, the main work is positioning and securing the machine body rather than disassembling and reassembling the entire system.
However, inclined-hole construction demands more site leveling than near-vertical holes. The information explicitly notes that for inclined-hole construction, site leveling and machine body securing should be completed in advance to avoid platform settlement affecting hole deviation control. Crawler travel speed is about 2.5 km/h, reference climbing angle is 30°, overall transport dimensions are about 5000×1800×2550 mm, and weight is about 5800 kg. These data are used to judge whether access roads, platform bearing capacity and move distances match; they cannot be used to infer that the rig can reach hole positions by itself on any mountainous terrain.
As hole depth increases, lifting force and winch capacity must be considered together
When inclined holes and deep holes are combined, resistance from drill string weight, hole-wall friction and local hole narrowing increases progressively. This model provides 152 kN lifting force and 63 kN feed force. The winch uses 6 mm wire rope, with 1000 m rope capacity, 13 kN lifting force and 120 m/min lifting speed. The lifting force leaves capacity margin for tripping out and recovering tools in complex hole sections, but operationally one should not rely on increasing lifting force to force through sticking; instead, judge the cause based on downhole resistance, mud circulation and formation changes.

Wireline coring retrieves core through the inner tube, reducing auxiliary time for repeatedly tripping the entire drill string. As hole depth increases, wire rope wear, flattening, broken wires and spooling on the drum need to be included in daily inspection. This is part of operating-condition management, not something equipment selection can solve once and for all.
Different rock formations require different rotation speed and torque
This model's power head rotation speed is 0–1500 rpm, with high-speed gear torque of about 300–800 N·m and torque gear of about 300–1000 N·m; the high-speed gear ratio is 1:2.2 and the low-speed gear ratio is 1:3. In intact hard rock, stable rotation speed and bit matching are more important; in broken zones and hole sections with higher resistance, lower rotation speed and a higher proportion of torque work are needed. The full-hydraulic feed system can adjust feed status according to formation changes, but specific parameter settings must consider rock abrasiveness, bit matrix and coring specification. The information does not provide recommended values classified by formation.
In fault gouge, breccia, strongly weathered layers or densely fractured sections, the information recommends shortening runs, reducing mechanical impact, and observing changes in return water and core integrity, with casing or adjusted flushing fluid properties used when necessary. In such formations, equipment capability is not the only variable; wall protection and run management also affect effective core recovery.
Supporting conditions for mud circulation and power configuration
The hydraulic mud pump has a reference flow of 100 L/min and pressure of 70 bar, used for bit cooling, cuttings carrying and hole-wall stability. Mud parameters in weathered rock, fractured rock and broken zones cannot simply copy those for intact hard rock conditions; they should be adjusted according to return water volume, cuttings concentration, loss conditions and hole-wall stability. When entering fractured aquifers or obvious loss zones, sudden changes in return water, pump pressure changes or increased mud consumption may occur. Hole depth and formation changes need to be recorded, then a decision made on whether to adjust circulation volume or take isolation measures.

The power system has a rated power of 132 hp (97 kW) and rated speed of 2200 rpm, with turbocharging and air-to-air intercooling. In high-altitude or high-temperature areas, air density, cooling conditions and power correction should be considered; actual output cannot be judged only by plain operating conditions. The equipment is configured with air-cooled heat dissipation and a high-power water-cooled heat exchanger. During long periods of high-load operation, attention should be paid to hydraulic oil temperature, engine coolant and radiator cleanliness.
Items still to confirm before purchase
The above information helps judge the rig's angle range, depth class, coring specification and basic supporting configuration, but it is not sufficient to directly conclude that a project is definitely suitable. When requesting quotations and confirming the plan, it is recommended to prepare the following information completely:
- Orebody attitude and the designed drill hole angle range, to confirm whether it falls within 45°–90°;
- Target hole depth and coring specification, distinguishing the hole sections for HTW, NTW and BTW;
- Formation data, including overburden thickness, intact hard rock sections, broken zones and aquifer positions;
- Access road width, slope, platform dimensions and ground bearing capacity, compared with transport dimensions and overall machine weight;
- On-site water and power conditions, mud material supply and drill tool specification matching;
- Power correction requirements in high-altitude or high-temperature environments.
Drill hole angle is a geological decision made at the hole layout stage; equipment class is the tool condition that puts that decision into practice. Confirming the angle and coring specification first, then comparing them with depth class and site constraints, is closer to the actual selection sequence than looking at model numbers first. This model is suitable for medium-depth mineral exploration and geological survey requiring continuous core information; drilling tasks aimed at rapid cuttings removal are outside its scope of application. Final configuration and drilling results should be based on confirmed equipment technical information and actual site conditions.