Which Specs to Read in Pairs for Mid-Deep Hole Coring

Date:2026-11-06 06:21:51Views:36

Mid-deep hole coring projects often face a specific difficulty at the equipment documentation stage: drilling depth, torque, rpm, feed stroke, pull-up force and rope capacity are scattered across different sections. Each can be remembered individually, but together they do not tell you what kind of hole a rig can handle. What really affects judgment is often not the size of a single number, but whether two figures are mutually consistent. Below, using documentation for a 600 m-class fully hydraulic integrated crawler core drilling rig as an example, we explain which groups of figures need to be read in pairs.

First, clarify the operational questions to answer

At this stage, readers usually need to answer not "is this machine good?" but: can the planned hole depth, hole angle, core size and rod length be coordinated on the same equipment set; and under what conditions do the capabilities stated in the documentation hold? Reading figures in pairs aims to turn these questions from "look at a single maximum value" into "check whether the combination is self-consistent."

Group 1: Drilling depth and core size

The model's documentation gives reference drilling depths of 800 m for B size, 600 m for N size and 300 m for H size; the 600 in the model name refers to the N-size reference depth. These three figures are not interchangeable, nor do they mean any formation can reach them. Hole angle, rock integrity, rod weight, downhole tools, mud performance, hole-wall stability and operating method all affect actual drilling depth.

Therefore, when reading, "target hole depth" and "planned core size" should be considered together: on the same rig, changing the size changes the reference depth by an order of magnitude. Remembering only "600 m-class" while ignoring size can easily mistake B-size capability for everyday N-size capability, or conversely underestimate the working range at smaller sizes.

Which Specs to Read in Pairs for Mid-Deep Hole Coring

Group 2: Torque and rpm

The documentation lists a maximum power-head torque of 960 N·m and a maximum speed of 1150 rpm, with gear conversion to direct drive/1:2.4 and hydraulic side shift. These two figures constrain different aspects: rpm relates to matching diamond coring drilling parameters, while torque relates to rotary reserve when downhole resistance is high. Only by reading them together can you judge whether there is room to adjust the bit, rpm, feed force and mud parameters under the planned hole depth and formation conditions. Emphasizing high rpm alone ignores the rise in rotary resistance in deep holes; looking only at torque does not explain what parameters maintain core quality.

Group 3: Feed stroke and rod length

The feed stroke is 1.9 m and can handle 1.5 m drill rods. These two figures must be understood as a pair: the stroke must cover the make-up and advancement of one rod to form a continuous rod-adding rhythm. Feed speed supports fast and slow adjustment, feed force is 42 kN and pull-up force is 130 kN. A mismatch between stroke and rod length directly affects the auxiliary actions for each rod; pull-up force relates to whether the drill string can be lifted smoothly when downhole resistance increases. Taken together, these three items are closer to actual operation than comparing pull-up force figures alone.

Group 4: Wireline winch rope capacity and hole depth

The wireline winch uses 6 mm steel wire rope, with 800 m rope capacity, 11 kN lifting force and 98 m/min lifting speed. The value of wireline coring lies in recovering the inner tube and core without frequently pulling the entire drill string, so rope capacity must correspond to the planned hole depth, and lifting force must correspond to the actual load conditions of the inner-tube assembly. Enough rope capacity but insufficient lifting force, or surplus lifting force but insufficient rope capacity, will both limit the continuity of wireline coring in deep hole sections. Only by reading this group in pairs can you estimate the approximate level of auxiliary time for continuous coring in mid-deep holes.

Which Specs to Read in Pairs for Mid-Deep Hole Coring

Group 5: Clamp through-hole and drill rod system

The clamp through-hole diameter is 127 mm, and the documentation states compatibility with common drill rod systems such as NQ, HQ, PQ, NTW and HTW. The through-hole diameter and rod system need to be checked together: whether the planned rod size falls within the compatible range directly determines whether rod adding, breaking out and collar operations can run smoothly. This item cannot be inferred from the through-hole figure alone; it should be confirmed item by item against the actual rod specifications.

Group 6: Mud pump parameters and formation conditions

The mud system has a reference flow of 100 L/min, pressure of 7 MPa, speed of 360 rpm and power of 14 kW. In core drilling, mud cools the bit, carries cuttings, stabilizes the hole wall and lubricates the drill string. Flow and pressure should be considered together with hole diameter, hole depth and formation: after entering broken zones, heavily weathered layers, fractured zones or loss zones, returns will change, requiring adjustment of mud viscosity, flow and wall-protection measures. Looking at the flow figure alone does not explain actual performance in loss formations.

Group 7: Power and whole-machine coordination

The power system is a 3.9 L four-cylinder turbocharged direct-injection diesel engine with rated power 97 kW, rated speed 2200 rpm, water cooling and a 24 V electrical system. The main pump has a reference flow of 220 L/min and pressure of 20 MPa; the auxiliary pump has a reference flow of 60 L/min and pressure of 17 MPa; cooling is air-cooled. Power figures should be read in pairs with hydraulic system demand: when the power head, feed, mast, travel and auxiliary mechanisms operate simultaneously, whether power and hydraulic flow have reserve can only be indicated by reference values in the documentation; actual performance still needs confirmation under working conditions.

Which Specs to Read in Pairs for Mid-Deep Hole Coring

Items still requiring confirmation beyond the figures

This model has an integrated crawler structure, supports 45°–90° drilling, and its folding mast helps reduce transport height; wireless remote control is available. However, the following conditions cannot be replaced by documentation and must be verified on site:

  • Transport road width, slope, curve radius, bridge and culvert load capacity, and platform dimensions;
  • Leveling and support conditions for slope work; stability cannot rely solely on crawler-ground friction;
  • The correspondence between planned hole angle and orebody attitude;
  • Integrity, loss conditions and wall-protection plan of the target formation;
  • Specific specifications and interface matching of drill rods, bits and other drilling tools.

These items should be confirmed one by one during inquiry and site-entry preparation, not inferred from documentation figures.

Information to provide when inquiring

Around the questions in this article, it is advisable to state at inquiry: drilling purpose and coring objective, planned hole depth and core size, hole angle, expected formation and hole-wall stability, drill rod specifications, access road and platform conditions, on-site power, water and mud material supply conditions, and whether inclined holes and continuous multi-site moves are required. Only by comparing these conditions with the paired figures in the documentation can you judge whether the model suits a specific project, rather than concluding from a single drilling depth figure.